Silo 3 Environmental Control Plan<br />

40430-PL-0005, ___ Rev. C<br />

-JacobTPSject-NGKberL35H 1 9605<br />

September 23, 2003<br />

The type and location <strong>of</strong> erosion control features will be subject to adjustment depending<br />

on field conditions. The Contractor will routinely inspect and evaluate (in accordance with<br />

Section 3.2) the effectiveness <strong>of</strong>, and need for maintenance <strong>of</strong>, the control measures that<br />

are in place.<br />

3.2 RUN-ON/RUNOFF CONTROL STRUCTURAL PRACTICES<br />

Process design and operation will minimize the potential for generation <strong>of</strong> contaminated<br />

stormwater, including any run-on and run<strong>of</strong>f. A description <strong>of</strong> the construction,<br />

inspection, and maintenance <strong>of</strong> the run-onhun<strong>of</strong>f control features is presented in this<br />

section. These features may include, but will not be limited to:<br />

0 Drainage channels and swales,<br />

0 Riprap check dams,<br />

Culverts,<br />

Silt fences, and<br />

0 Diversions.<br />

Details <strong>of</strong> silt fences, check dams, and diversions can be seen in Appendix A. Any repairs<br />

to the erosion and stormwater control measures will be performed within 24 hours <strong>of</strong> a<br />

problem being discovered. Areas <strong>of</strong> excavation and all erosion control measures will be<br />

inspected to verify that they are installed in accordance with the Silo 3 specifications and<br />

are still functioning properly. An inspection checklist will be developed in support <strong>of</strong> the<br />

inspection schedule. Disturbed areas will also be inspected for evidence <strong>of</strong> excessive<br />

erosion or siltation. These inspections will occur, at a minimum, at the following<br />

frequency:<br />

0 Weekly for general inspections;<br />

Daily after each rain event exceeding 0.5 inches; and<br />

At least once per day during prolonged rainfall events.<br />

Inspections will be documented in the daily reports at the Silo 3 Project site. These<br />

records will be made available for review upon request. This inspection frequency is in<br />

addition to any specific requirements identified in the Inspection and Maintenance<br />

requirements for each control measure below.<br />

8<br />

000160