02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a<br />

e<br />

a<br />

~<br />

DCL-19-5202A<br />

DCL-19-5202B<br />

DCL-19-5202A<br />

PDI-DCL-19-<br />

5202A<br />

PDI-DCL-19-<br />

52028<br />

LSH-DCL-19-<br />

5202A<br />

LSHH-DCL-19-<br />

5202A<br />

LSH-DCL-19-<br />

52028<br />

LSHH-DCL-19-<br />

52028<br />

YI-DCL-19-5202<br />

LSH-HBN-19-<br />

5205A<br />

LSH-HBN-19-<br />

52058<br />

LSH-FLT-19-<br />

5204<br />

PDI-FLT-19-<br />

5204A<br />

Table 4-3 PVS Setpoints<br />

I<br />

Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003. Rev. 1<br />

Jacobs Proiect Number 35H 19605<br />

September 5, 2003<br />

5069 I<br />

Differential Pressure:<br />

1 in wg Low (24)<br />

7 in wg High (24)<br />

8 in wg High-High Operator Action<br />

Differential Pressure:<br />

1 in wg Low (23)<br />

7 in wg High (23)<br />

8 in wg High-High Operator Action<br />

24 in High Level Operator Action<br />

36 in High-High Level (41 1<br />

24 in High Level Operator Action<br />

36 in High-High Level (41 1<br />

0.005 gr/scf High Particulate<br />

Count<br />

Operator Action<br />

0.01 0 gr/scf High-High Particulate<br />

Count<br />

(27, 28)<br />

24 in High Level Operator Action<br />

24 in High Level Operator Action I<br />

12 in High Level in Operator Action<br />

Condensate Leg13<br />

Differentia I Pressure :<br />

1 in wg Low Operator Action<br />

7 in wg High Operator Action<br />

8 in wg High-High . Operator Action<br />

l1 The PVS fans are shut down when the panic bar on emergency egress door 008B is activated.<br />

This relieves negative pressure in the Excavator Service Room, allowing the door to be opened, thus<br />

complying with Life Safety Code Requirements. The control system and HMI settings limit the<br />

number <strong>of</strong> fan restarts per hour.<br />

'* All setpoints will be reviewed and modified as necessary during startup.<br />

l3 The inlet duct to FLT-19-5204A&B exits the Process Building to the outdoors and drops<br />

approximately 20 ft to the filters. Since the duct carries high-dewpoint, conditioned air, condensate<br />

is likely to form inside the duct during cold weather. For this reason, a condensate leg (with high-<br />

level alarm and drain valve) is provided just upstream <strong>of</strong> the filters. This enables the operator to<br />

drain excess condensate out <strong>of</strong> the PVS before the duct fills with water, causing entrainment <strong>of</strong><br />

moisture into the HEPA/ULPA filter elements.<br />

.JL 008114<br />

4-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!