02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

,: 'L - ~~<br />

*' j :-<br />

0<br />

- -~~____<br />

Timed Estimate <strong>of</strong> Secondary Waste for the Silo 3 Project<br />

Document No. 40430-RP-0012, Rev. 0<br />

JE Project No. 35H19605<br />

July 11, 2002<br />

The PPE and respirators used for HVAC are included in PRS and MRS activities.<br />

2.8 Miscellaneous Streams<br />

______<br />

- 5069<br />

The following assumptions apply to the miscellaneous stream amount <strong>of</strong> secondary waste<br />

generated:<br />

An allowance <strong>of</strong> one 55-gallon drum per month for secondary containment water is<br />

included in the estimate<br />

Unused Silo 3 sample material will be shipped to the same ultimate disposition as the<br />

bulk <strong>of</strong> the Silo 3 material recovered during operations. Silo 3 material in its sampling<br />

containers will be discarded in 55-gallon drums. An allowance <strong>of</strong> two drums is included<br />

in the estimate.<br />

An allowance <strong>of</strong> 5 gallons <strong>of</strong> lubricating oil is included in the estimate. One half will be<br />

used in 6 months and the other will be generated at the end.<br />

A 10 percent allowance for miscellaneous and currently unidentified streams is<br />

provided in the estimate for radiologically contaminated materials.<br />

A 25 percent allowance for miscellaneous and currently unidentified streams is<br />

provided in the estimate for non-radiologically contaminated materials.<br />

3.0 ATTACHMENTS<br />

Table 1, Secondary Waste Generation<br />

.. . ..<br />

5<br />

000243

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!