02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

0 Packaging Frames do not come into contact with each other;<br />

0<br />

0<br />

0<br />

0<br />

Packaging Frames do not come into contact with the roll-up doors;<br />

Receiving conveyors are in motion before frames are placed on them;<br />

Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003. Rev. 1<br />

Jacobs Project Number 35H19605<br />

September 5, 2003<br />

5.(-6-9-.-<br />

Frames come to a stop once they are fully on the Off-Loading Conveyors; and<br />

Roll-up doors and pass doors are operated to maintain the airlock.<br />

Bags are lifted from the Off-Loading Conveyors by the Bridge Crane (BRC-25-5280) and<br />

17. The need for sampling is pending confirmation <strong>of</strong> both regulatory and disposal-facility<br />

requirements.<br />

la These interlocks apply only to Packaging Line A. Equipment and instrumentation designators for<br />

Line B are similar. *<br />

5-4<br />

008119<br />

___ ~<br />

e<br />

e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!