02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

4.0 Reporting<br />

Silos Project Environmental Monitoring Pian<br />

40000-PL-0010<br />

August 29, 2002<br />

5-- 5Qh9<br />

All project-specific environmental monitoring will be reported in Project Completion Reports,<br />

which will include a summary <strong>of</strong> the results generated during the projects. For radon<br />

monitoring, the report will identify each <strong>of</strong> the radon monitoring locations and the minimum,<br />

maximum, and average radon levels at each <strong>of</strong> those locations. For project-specific air<br />

particulate monitoring, the report will identify each <strong>of</strong> the monitoring locations and the<br />

minimum, maximum, and average levels <strong>of</strong> each analyte at each <strong>of</strong> the locations. For direct<br />

radiation monitoring, the report will include -TLD locations and a summary <strong>of</strong> quarterly results.<br />

Data from the radon monitors discussed in Section 3.1.3 will be reported in the IEMP mid-year<br />

summary and the Site Environmental Report (SER) in addition to the radon summary data and<br />

real-time radon data available through the IEMP Data Information Site. Direct radiation<br />

monitoring datasfrom the TLD locations discussed in Section 3.2 will also be reported in these<br />

two IEMP reports. In addition, other project-specific data may be reported as necessary in the<br />

IEMP mid-year report or SER to explain results that have the potential to impact regulatory<br />

compliance limits as measured through the IEMP air monitoring program.<br />

5.0 References<br />

Revised Silo 3 Project Remedial Design Package, 40430-RDP-0001, May 2002.<br />

Revised Silos 1 and 2 Accelerated Waste Retrieval Project Remedial Design Package,<br />

June 2002<br />

Environmental Control Plan for the Silos 1 and 2 Accelerated Waste Retrieval Project,<br />

407 10-PL-0007, June 2002.<br />

Silo 3 Project Environmental Control Pian, 40430-PL-0005, April 2002.<br />

Integrated Environmental Monitoring Plan, 2505-WP-0022, Revision 2 January 200 1 .<br />

Preliminary Hazards Analysis Report for Silo 3, RMR-0445-0056-002, Rocky Mountain<br />

Remediation Services, January 2000.<br />

Preliminary Hazards Analysis report for the Silos 1 and 2 Accelerated Waste Retrieval<br />

Project, 624-P622-50, Foster Wheeler Environmental Corporation, January 2000<br />

7 <strong>of</strong> 7