e JACOBS<br />

Silo 3 Environmental Control Plan<br />

40430-PL-0005, Rev. C<br />

Jacobs Project Number 35H19605<br />

September 23, 2003<br />

The Contractor will follow the requirements <strong>of</strong> Fluor Fernald ACR-007, Waste Material<br />

Handling Criteria for Construction Projects (June 1 998).<br />

5.7 WASTEWATER CONTROL<br />

Wastewater generated during construction will be collected in sumps or by other means<br />

and pumped through silt fence or check dams prior to discharge to the existing drainage<br />

features near the site. Any contaminated wastewater encountered will be collected and<br />

disposed <strong>of</strong> at the direction <strong>of</strong> the Construction Manager and this plan. Wastewater<br />

generated during operation will be collected and treated according to the Process<br />

Description for the Silo 3 Project (Section 6.5).<br />