02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

.i\ . . +<br />

Q :.h- '2. *L<br />

* .f .a ..*<br />

Process Uescriptton tor the Silo 3 rroject<br />

Document No. 40430-RP-0003, Rev. 1<br />

Jacobs Project NO. 35H19605<br />

September 5, 2003<br />

5. Fasten outer container straps to lifting frame as required to lift container.<br />

C 369<br />

6. Unlatch and loosen Packaging Frame (Note: A chain keeps the sides <strong>of</strong> the frame from<br />

totally unfolding).<br />

7. Use Bridge Crane and lifting frame to pick container up out <strong>of</strong> Packaging Frame and set<br />

on floor.<br />

8. Attach label to container; place either in cargo container or on pallet.<br />

9. Return Packaging Frame to Packaging Area for reuse (see Section 3.2).<br />

1 O.(Cargo container only) Once cargo container is loaded with bags, replaceklose lid using<br />

Bridge Crane. Use heavy-duty forklift to transport cargo container to a staging area,<br />

where either a crane or forklift places cargo containers on either a rail car or a truck.<br />

1 1 .(Pallet only) Use standard-duty forklift to transport pallet to a staging area, where it is<br />

placed on either a rail car or a truck.<br />

12.Transport full containers by either rail or truck to an <strong>of</strong>f-site disposal facility.<br />

3-6<br />

. .<br />

808037<br />

I<br />

,'P

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!