02.03.2013 Views

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

silo 3 - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I<br />

-<br />

I 2 I 3 I 4 I 5 I 6 I 7 I 8<br />

I<br />

FRW SUPPLY<br />

HEPA FILTER<br />

L<br />

(EX1 SI’<br />

Jt<br />

IC I<br />

TO PNEUUAlIC<br />

RETRIEVAL CaLECTOR<br />

TO PROCESS VENT<br />

DUST COLLECTOR<br />

GENERAL NOTES:<br />

I<br />

I. THE WeLR Or V A W WAND ENCLOSURES Ih WERATlPl AT<br />

THE SAIE IlE SHALL BE DElEfWlNED 81 FLUOR FERNUD.<br />

WE FLLX HOSE FRDY IhE PNEUMATIC RElRlEVU SYSIEY 4EWE<br />

WILL BL ATIACHED TO THE WAND IN USE.<br />

IDLE EllClDSURES TO dAVE COVERS INSTALLED.<br />

?. DCLElED<br />

).EACH VICWY UAND ENCLOSURE HAS A ‘ri HP YOTOR FOR<br />

A HOIST.<br />

I. DELETED<br />

UNITED STATES<br />

DEPARTMENT OF ENERGY<br />

FERNAID -AL YAWIQemrr PROJEC<br />

uSpLI0-m<br />

sa0 3<br />

PllDrmr<br />

INSTRUENTATION<br />

RPNC *M, NST<br />

- 5069<br />

000313

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!