Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003, Rev. 1<br />

Jacobs Project Number 35H19605<br />

September 5, 2003 ~-<br />

~__.___.__~~<br />

REFERENCE DRAWINGS: 506;' @<br />

Process Flow Diagrams:<br />

94X-3900-F-01428 FOOOl<br />

94X-3900-F-01429 F0002<br />

94X-3900-F-01431 F0003<br />

94X-3900-F-01430 F0004<br />

94X-3900-F-01432 F0005<br />

Piping & Instrument Diagrams:<br />

94X-3900-N-01381 NO001<br />

94X-3900-N-01382 NO002<br />

94X-3900-N-07 383 NO003<br />

94X-3900-N-02369 NO099<br />

94X-3900-N-01433 NO1 00<br />

94X-3900-N-01434 NO1 01<br />

94X-3900-N-01435 NO1 02<br />

94X-3900-N-01436 NO1 03<br />

94X-3900-N-01437 NO1 04<br />

94X-3900-N-0 1 438 NO1 05<br />

94X-3900-N-01439 NO1 06<br />

Material Balance Table<br />

Material Retrieval and Feed Systems<br />

Process Vent and Packaging Systems<br />

Additive and Wastewater Systems<br />

Plant, Instrument, and Breathing Air Systems<br />

Piping, Valves, and Miscellaneous<br />

Instrumentation<br />

Equipment and Miscellaneous<br />

Silo 3 Access<br />

Mechanical Retrieval System<br />

Pneumatic Retrieval System<br />

Feed System<br />

Bulk Bag Packaging Line A<br />

Bulk Bag Packaging Line B .<br />

Additive Mixing and Wastewater Systems<br />

Process Vent System, Sheet 1 <strong>of</strong> 2<br />

94~~3900-N-0 14_4_O NO 107- - Prweess -Vent-Sy_sltemJ -S-h~et-Z <strong>of</strong> 2- - - - - . - - - __ - - . - .<br />

94X-3900- \s-01441<br />

94X-3900- u-0 1 442<br />

94X-3900- u-0 1 443<br />

NO108<br />

NO109<br />

NO110<br />

Plant Air System<br />

Instrument Air System Connections<br />

Breathing Air System<br />

I<br />

94X-3900- u-0 1 444 NO1 11 Plant Air System Connections<br />

94X-3900- U-01445 NO112 Breathing Air System Connections<br />

94X-3900- U-0 1 446 NO 1.1 3 Instrument Air System Connections<br />

94X-3900- u-0 1 447 NO1 14 Domestic and Process Water Systems<br />

94X-3900- V-02993 NO1 15 Vacuum Wand Enclosure<br />

94X-3900- V-05 1 47 NO116 Additive Charging System<br />

94X-3900- U-05 1 39 NO117 Additive Feed System<br />

94X-3900-M-0 1461<br />

94X-3900-M-01463<br />

94X-3900-M-01464<br />

94X-3900-M-01465<br />

94X-3900-M-0 1466<br />

94X-3900-M-0 1467<br />

94X-3900-M-0 1468<br />

94X-3900-M-0 1469<br />

94X-3900-M-01470<br />

MOO01<br />

MOO02<br />

MOO03<br />

MOO04<br />

MOO06<br />

MOO07<br />

MOO08<br />

MOO09<br />

MOO10<br />

General Arrangement Plot Plan<br />

General Arrangement East Elevation<br />

General Arrangement 1 a Floor Plan<br />

General Arrangement Plan at EL 597'-8"<br />

General Arrangement Section E<br />

General Arrangement Section A<br />

General Arrangement Section B<br />

General Arrangement Section C<br />

General Arrangement Section D<br />

vi 000087<br />