Process Control Plan for the Silo 3 Project<br />
Document No. 40430-PL-0003, Rev. 1<br />
Jacobs Project Number 35H19605<br />
September 5, 2003 ~-<br />
~__.___.__~~<br />
REFERENCE DRAWINGS: 506;' @<br />
Process Flow Diagrams:<br />
94X-3900-F-01428 FOOOl<br />
94X-3900-F-01429 F0002<br />
94X-3900-F-01431 F0003<br />
94X-3900-F-01430 F0004<br />
94X-3900-F-01432 F0005<br />
Piping & Instrument Diagrams:<br />
94X-3900-N-01381 NO001<br />
94X-3900-N-01382 NO002<br />
94X-3900-N-07 383 NO003<br />
94X-3900-N-02369 NO099<br />
94X-3900-N-01433 NO1 00<br />
94X-3900-N-01434 NO1 01<br />
94X-3900-N-01435 NO1 02<br />
94X-3900-N-01436 NO1 03<br />
94X-3900-N-01437 NO1 04<br />
94X-3900-N-0 1 438 NO1 05<br />
94X-3900-N-01439 NO1 06<br />
Material Balance Table<br />
Material Retrieval and Feed Systems<br />
Process Vent and Packaging Systems<br />
Additive and Wastewater Systems<br />
Plant, Instrument, and Breathing Air Systems<br />
Piping, Valves, and Miscellaneous<br />
Instrumentation<br />
Equipment and Miscellaneous<br />
Silo 3 Access<br />
Mechanical Retrieval System<br />
Pneumatic Retrieval System<br />
Feed System<br />
Bulk Bag Packaging Line A<br />
Bulk Bag Packaging Line B .<br />
Additive Mixing and Wastewater Systems<br />
Process Vent System, Sheet 1 <strong>of</strong> 2<br />
94~~3900-N-0 14_4_O NO 107- - Prweess -Vent-Sy_sltemJ -S-h~et-Z <strong>of</strong> 2- - - - - . - - - __ - - . - .<br />
94X-3900- \s-01441<br />
94X-3900- u-0 1 442<br />
94X-3900- u-0 1 443<br />
NO108<br />
NO109<br />
NO110<br />
Plant Air System<br />
Instrument Air System Connections<br />
Breathing Air System<br />
I<br />
94X-3900- u-0 1 444 NO1 11 Plant Air System Connections<br />
94X-3900- U-01445 NO112 Breathing Air System Connections<br />
94X-3900- U-0 1 446 NO 1.1 3 Instrument Air System Connections<br />
94X-3900- u-0 1 447 NO1 14 Domestic and Process Water Systems<br />
94X-3900- V-02993 NO1 15 Vacuum Wand Enclosure<br />
94X-3900- V-05 1 47 NO116 Additive Charging System<br />
94X-3900- U-05 1 39 NO117 Additive Feed System<br />
94X-3900-M-0 1461<br />
94X-3900-M-01463<br />
94X-3900-M-01464<br />
94X-3900-M-01465<br />
94X-3900-M-0 1466<br />
94X-3900-M-0 1467<br />
94X-3900-M-0 1468<br />
94X-3900-M-0 1469<br />
94X-3900-M-01470<br />
MOO01<br />
MOO02<br />
MOO03<br />
MOO04<br />
MOO06<br />
MOO07<br />
MOO08<br />
MOO09<br />
MOO10<br />
General Arrangement Plot Plan<br />
General Arrangement East Elevation<br />
General Arrangement 1 a Floor Plan<br />
General Arrangement Plan at EL 597'-8"<br />
General Arrangement Section E<br />
General Arrangement Section A<br />
General Arrangement Section B<br />
General Arrangement Section C<br />
General Arrangement Section D<br />
vi 000087<br />
I<br />
0<br />
-