69<br />

o<br />

Process Control Plan for the Silo 3 Project<br />

Document No. 40430-PL-0003, Rev. 1<br />

Jacobs Project Number 35H99605<br />

Table 8-2 Additive System Interlocks 1<br />

when E-stop on AOV-25-5260A is<br />

open SOV-50-5004A.<br />

When Charge System B is in charge<br />

cycle, close SOV-50-5004B.<br />

System A or B, and if flow is detected in<br />

8-6<br />

PM P-44-5004A I Z I-AOV-2 5-5 2 60A<br />

FI-PWIP-44-5004B<br />

I