DIRECTIONS FOR CORKBOARD ERECTION 293<br />

the wall, in a straight line, slightly press the <strong>cork</strong>boards into<br />

place and securely nail in positi<strong>on</strong> to sheathing with gal-<br />

vanized wire nails driven obliquely, three nails per square<br />

foot. Keep the <strong>cork</strong>boards in perfect alignment, so that the<br />

joints in the rows to follow may fit close and seal tight.<br />

Break all joints between the different rows, by starting<br />

alternate rows with half-length boards, and see that all joints<br />

are butted close and sealed tight. When the opposite end<br />

and the opposite side of the ceiling area is reached, cut pieces<br />

of <strong>cork</strong>board neatly to fit and seal with the wall lines of the<br />

room.<br />

Give the Asphalt cement ample time to cool and set, say<br />

12 hours, before erecting another layer of <strong>cork</strong>board against<br />

the first, or before applying a finish over the <str<strong>on</strong>g>insulati<strong>on</strong></str<strong>on</strong>g>.<br />

127.—Sec<strong>on</strong>d Layer <str<strong>on</strong>g>Cork</str<strong>on</strong>g>board, to First Layer <strong>on</strong> Ceiling,<br />

in Portland Cement Mortar.—See that the first layer of <strong>cork</strong>-<br />

board <strong>on</strong> the ceiling is solidly attached, and presents a reas<strong>on</strong>-<br />

ably smooth and level surface,* and then remove all dust, dirt,<br />

or other foreign material, before making preparati<strong>on</strong>s to erect<br />

a sec<strong>on</strong>d layer of <strong>cork</strong>board in Portland cement mortar.<br />

Saw sufficient <strong>cork</strong>boards lengthwise down the center so<br />

as to have enough half-width pieces to make <strong>on</strong>e row al<strong>on</strong>g<br />

<strong>on</strong>e side of the ceiling. Cut a piece 6 inches wide and 27 inches<br />

l<strong>on</strong>g with which to start setting the half-width pieces in proper<br />

positi<strong>on</strong> to the ceiling area, in a straight line, against the<br />

edge of the wall.<br />

Prepare suitable Portland cement mortar in reas<strong>on</strong>able<br />

quantity, coat <strong>on</strong>e side of each piece of <strong>cork</strong>board with a<br />

half-inch of Portland cement mortar, put each in proper<br />

positi<strong>on</strong> against the ceiling, press firmly into place and addi-<br />

ti<strong>on</strong>ally secure with galvanized wire nails or wood skewers,<br />

as specified, driven obliquely, three per square foot. Keep<br />

the pieces of <strong>cork</strong>board in perfect alignment, so that the joints<br />

in the rows to follow may fit close and seal tight.<br />

Then start with a full-width and 9-inch l<strong>on</strong>g piece of <strong>cork</strong>-<br />

board and set the sec<strong>on</strong>d row of full-size <strong>cork</strong>boards adjacent<br />

to the first row, thus breaking all joints in the sec<strong>on</strong>d layer,<br />

*If necessary, cut off any protruding corners or edges of <strong>cork</strong>board with a suitable