99<br />
Tennis<br />
• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />
crusher run stone. Sub-Surface drains to connect at the lowest point to a storm water catch<br />
pit which should be connected to a storm water main.<br />
• The compacted earth layer must be covered with a 125 mm thick layer of crusher run to<br />
assist in the sub-surface drainage.<br />
• Insert layer of 250 micron damp proof course.<br />
• Place 150 mm thick layer of 20 (Mpa) concrete surface bed fi nished smooth with a fi nal<br />
brushed surface.<br />
• If the fi nal concrete surface is not smooth <strong>and</strong> level, a levelling screed has to be applied with<br />
a minimum thickness of 15 mm.<br />
• The concrete <strong>and</strong> screed fi nish needs to dry out for a period of twenty eight days before the<br />
fi nal synthetic fi nish can be applied.<br />
• The fi nal synthetic court surface is laid in two or three layers dependant on the specifi c<br />
Manufacturers instructions.<br />
• The court lines are applied when the surfaces have dried.<br />
Grass court construction<br />
The general specifi cation of the sub-surface may vary dependant on site conditions <strong>and</strong> should be in<br />
terms with a Civil Engineers specifi cations. The general specifi cation may, however, be described as<br />
follows:<br />
• Remove all topsoil. Remove all topsoil <strong>and</strong> level earth platform to correct site development<br />
levels with particular emphasis on natural sub-soil drainage.<br />
• Rip <strong>and</strong> compact in-situ earth to 95 % modifi ed AASHTO.<br />
• Install sub-surface drainage comprising 110 mm diameter agricultural drains placed in 450<br />
x 600 mm deep drainage system to the perimeter of each tennis court.<br />
• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />
crusher run stone. Sub-Surface drains to connect at the lowest point to a storm water catch<br />
pit which should be connected to a storm water main.<br />
• Dependant on the nature of the site, the sub-surface drains may be covered with a 100 mm<br />
thick layer of crusher run to assist in the sub-surface drainage. The crusher run layer is<br />
levelled, compacted <strong>and</strong> covered with a 25 mm thick layer of course river s<strong>and</strong>.<br />
• Import, spread <strong>and</strong> level 100 mm thick layer of weed free top soil <strong>and</strong> compact lightly.<br />
(Importation of top soil only necessary when the local top soil is not suitable)<br />
• Fertilise soil as per chemical soil analysis <strong>and</strong> grass with either a fi ne bladed grass or<br />
alternatively with “Golfi ng Green” grass. Seeding should be done transversely in two<br />
applications to ensure an even spread of seed.