99<br />

Tennis<br />

• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />

crusher run stone. Sub-Surface drains to connect at the lowest point to a storm water catch<br />

pit which should be connected to a storm water main.<br />

• The compacted earth layer must be covered with a 125 mm thick layer of crusher run to<br />

assist in the sub-surface drainage.<br />

• Insert layer of 250 micron damp proof course.<br />

• Place 150 mm thick layer of 20 (Mpa) concrete surface bed fi nished smooth with a fi nal<br />

brushed surface.<br />

• If the fi nal concrete surface is not smooth <strong>and</strong> level, a levelling screed has to be applied with<br />

a minimum thickness of 15 mm.<br />

• The concrete <strong>and</strong> screed fi nish needs to dry out for a period of twenty eight days before the<br />

fi nal synthetic fi nish can be applied.<br />

• The fi nal synthetic court surface is laid in two or three layers dependant on the specifi c<br />

Manufacturers instructions.<br />

• The court lines are applied when the surfaces have dried.<br />

Grass court construction<br />

The general specifi cation of the sub-surface may vary dependant on site conditions <strong>and</strong> should be in<br />

terms with a Civil Engineers specifi cations. The general specifi cation may, however, be described as<br />

follows:<br />

• Remove all topsoil. Remove all topsoil <strong>and</strong> level earth platform to correct site development<br />

levels with particular emphasis on natural sub-soil drainage.<br />

• Rip <strong>and</strong> compact in-situ earth to 95 % modifi ed AASHTO.<br />

• Install sub-surface drainage comprising 110 mm diameter agricultural drains placed in 450<br />

x 600 mm deep drainage system to the perimeter of each tennis court.<br />

• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />

crusher run stone. Sub-Surface drains to connect at the lowest point to a storm water catch<br />

pit which should be connected to a storm water main.<br />

• Dependant on the nature of the site, the sub-surface drains may be covered with a 100 mm<br />

thick layer of crusher run to assist in the sub-surface drainage. The crusher run layer is<br />

levelled, compacted <strong>and</strong> covered with a 25 mm thick layer of course river s<strong>and</strong>.<br />

• Import, spread <strong>and</strong> level 100 mm thick layer of weed free top soil <strong>and</strong> compact lightly.<br />

(Importation of top soil only necessary when the local top soil is not suitable)<br />

• Fertilise soil as per chemical soil analysis <strong>and</strong> grass with either a fi ne bladed grass or<br />

alternatively with “Golfi ng Green” grass. Seeding should be done transversely in two<br />

applications to ensure an even spread of seed.