28.03.2013 Views

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

KORFBALL COURT<br />

The Korfball Field indicated below has been calculated at its size of 40.00m x 20.00 m.<br />

Elemental<br />

Costing<br />

NO. ITEM UNITS QTY RATE R % AMOUNT R TOTALS R<br />

A. SUB-STRUCTURE, ETC.<br />

(Provisional)<br />

Removal of Trees (Size ………) No. 1 3,000.00 0.91 3,000.00<br />

Clear site m2 989 6.00 1.79 5,934.00<br />

Removal of Topsoil incl. Carting Away m3 99 105.00 3.14 10,395.00<br />

Bulk Earthworks m3 198 35.00 2.09 6,930.00<br />

Rip & Compact In-Situ Earth to 93 % ModAASHTO m2 989 6.00 1.79 5,934.00<br />

Herring Bone Sub-Soil Drainage m 480 90.00 13.05 43,200.00<br />

Storm Water Reticulation m 25 145.00 1.10 3,625.00<br />

Storm Water Catchpits, etc. No. 3 2,200.00 1.99 6,600.00<br />

Water Supply for Sprinkler System m 161 85.00 4.13 13,685.00<br />

110 mm Diameter Sleeves m 10 120.00 0.36 1,200.00<br />

Automatic Irrigation System m2 989 8.00 2.39 7,912.00<br />

Crusher run Base Course m3 148 230.00 10.28 34,040.00<br />

Coarse River S<strong>and</strong> Layer m2 25 7.00 0.05 175.00<br />

DPC Membrane m2 60 12.00 0.22 720.00<br />

Compost m2 49 160.00 2.39 7,912.00<br />

Imported Clay Topsoil m3 148 180.00 8.05 26,640.00<br />

Levelling <strong>and</strong> Shaping m2 989 3.00 0.90 2,967.00<br />

Grass m2 989 20.00 5.98 19,780.00<br />

Fertiliser m2 989 3.00 0.90 2,967.00 203,616.00<br />

B. SPECIALIST ITEMS<br />

Posts No. 2 4,800.00 2.90 9,600.00<br />

Demarcation Lines m 197 12.00 0.71 2,364.00 11,964.00<br />

SUB-TOTALS 65.13 215,580.00<br />

PRELIINARIES AND GENERAL 7.82 25,870.00<br />

SUB-TOTALS 72.95 241,450.00<br />

CONTINGENCIES % 5 3.65 12,073.00<br />

PROVISION FOR ESCALATION Months 4 1.38 4,563.00<br />

SUB-TOTALS 77.97 258,086.00<br />

PROFESSIONAL FEES % 12.5 9.75 32,261.00<br />

SUB-TOTALS 87.72 290,347.00<br />

VALUE ADDED TAX % 14 12.28 40,649.00<br />

KORFBALL TOTAL<br />

Note: All fi gures have been rounded up.<br />

100.00 330,996.00<br />

138

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!