28.03.2013 Views

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Foundations<br />

ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />

1<br />

BILL NO. 4<br />

CONCRETE, FORMWORK AND REINFORCEMENT<br />

For preambles see Model Preambles<br />

CONCRETE TESTS<br />

Prepare a set of three concrete cubes each size 150 x 150 x 150 mm<br />

for strength tests <strong>and</strong> deliver to an approved laboratory for testing <strong>and</strong><br />

pay all charges in connection therewith.<br />

No 12 136.00 1,632.00<br />

2 The cost of preliminary tests prior to approval of the Contractor’s<br />

materials <strong>and</strong> mixes shall be borne by the Contractor.<br />

3 The cost of subsequent tests shall be borne by the Employer unless<br />

the results show that the materials or concrete do not conform to the<br />

specifi ed requirements.<br />

Item 1 -<br />

Item 1<br />

Foundations<br />

4 All concrete slump tests must be prepared <strong>and</strong> paid for by<br />

the Contractor.<br />

MASS CONCRETE<br />

Mass concrete (25 MPa) in:<br />

Item 1 -<br />

5 Surface beds. m3 94 785.00 73,790.00<br />

6 In thickening out of surface beds when casting against rock. m3 1 785.00 785.00<br />

7 Steps. m3 3 840.00 2,520.00<br />

8<br />

REINFORCED CONCRETE<br />

Reinforced concrete (25 MPa) in:<br />

Slabs. m3 131 785.00 102,835.00<br />

9 Ramps m3 14 785.00 10,990.00<br />

10 Beams. m3 86 785.00 67,510.00<br />

11 Inverted beams. m3 6 785.00 4,710.00<br />

12 Stairs <strong>and</strong> raking slabs.<br />

Reinforced concrete (40 MPa) in:<br />

m3 7 840.00 5,880.00<br />

13 Columns<br />

Sundries<br />

m3 15 895.00 13,425.00<br />

14 Strike off <strong>and</strong> cure top surface of concrete to smooth uniform level. m2 2097 12.00 25,164.00<br />

SUB-TOTAL TO COLLECTION R<strong>and</strong> 309,241.00<br />

148

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!