Construction of a natural grass rugby fi eld<br />
The construction of the outdoor grass rugby fi eld may be briefl y described as follows:<br />
The general specifi cation of the sub-surface may vary dependant on site conditions <strong>and</strong> should be in<br />
terms with a Civil Engineers specifi cations. The general specifi cation may, however, be described as<br />
follows:<br />
• Remove all topsoil. Remove all topsoil <strong>and</strong> level earth platform to correct site development<br />
levels with particular emphasis on natural sub-soil drainage.<br />
• Rip <strong>and</strong> compact in-situ earth to 93 % modifi ed AASHTO.<br />
• Install sub-surface drainage comprising 110 mm diameter agricultural drains placed in 450<br />
x 600 mm deep herring bone drainage system at 6 metre intervals <strong>and</strong> to entire perimeter<br />
of the cricket fi eld.<br />
• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />
crusher run stone.<br />
• Sub-Surface drains to connect at the lowest point to a storm water catch pit which should<br />
be connected to a storm water main.<br />
• The sub-surface drains are then covered with a 100 mm thick layer of crusher run to assist<br />
in the sub-surface drainage (Optional dependant on the drainage characteristics of the insitu<br />
soil).<br />
• The crusher run layer is levelled, lightly compacted <strong>and</strong> covered with a 25 mm thick layer<br />
of course river s<strong>and</strong>.<br />
• Import, spread <strong>and</strong> level 100 mm thick layer of weed free top soil <strong>and</strong> compact lightly.<br />
• Fertilise soil as per chemical soil analysis <strong>and</strong> grass with either Kikuyu grass.<br />
• Once the grass is established, top dress.<br />
• Cover grass with thin layer of sieved of top soil to a depth of not more than 15 mm over the<br />
grass <strong>and</strong> smooth.<br />
• Water daily or as may be required.<br />
Rugby<br />
• Regular soil tests should be taken to ensure that the correct fertilisation program is carried<br />
out.<br />
• Grass matting should be avoided <strong>and</strong> always controlled by vertical cutting. Length of grass<br />
should never be longer than 25 mm when played on.<br />