65<br />

be connected to a storm water main.<br />

• The sub-surface drains are then covered with a 100 mm thick layer of crusher run to assist<br />

in the sub-surface drainage (Optional dependant on the drainage characteristics of the insitu<br />

soil).<br />

• The crusher run layer is levelled, lightly compacted <strong>and</strong> covered with a 25 mm thick layer<br />

of course river s<strong>and</strong>.<br />

• Import, spread <strong>and</strong> level 100 mm thick layer of weed free top soil <strong>and</strong> compact lightly.<br />

• Fertilise soil as per chemical soil analysis <strong>and</strong> grass with either Kikuyu grass or alternatively<br />

with “Golfi ng Green” grass.<br />

• Once the grass is established, top dress.<br />

• Cover grass with thin layer of sieved of top soil to a depth of not more than 15 mm over the<br />

grass <strong>and</strong> smooth.<br />

• Water daily or as may be required.<br />

Softball<br />

• Regular soil tests should be taken to ensure that the correct fertilisation program is carried<br />

out.<br />

• Grass matting should be avoided <strong>and</strong> always controlled by vertical cutting. Length of grass<br />

should never be longer than 15 mm when played on.