SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
65<br />
be connected to a storm water main.<br />
• The sub-surface drains are then covered with a 100 mm thick layer of crusher run to assist<br />
in the sub-surface drainage (Optional dependant on the drainage characteristics of the insitu<br />
soil).<br />
• The crusher run layer is levelled, lightly compacted <strong>and</strong> covered with a 25 mm thick layer<br />
of course river s<strong>and</strong>.<br />
• Import, spread <strong>and</strong> level 100 mm thick layer of weed free top soil <strong>and</strong> compact lightly.<br />
• Fertilise soil as per chemical soil analysis <strong>and</strong> grass with either Kikuyu grass or alternatively<br />
with “Golfi ng Green” grass.<br />
• Once the grass is established, top dress.<br />
• Cover grass with thin layer of sieved of top soil to a depth of not more than 15 mm over the<br />
grass <strong>and</strong> smooth.<br />
• Water daily or as may be required.<br />
Softball<br />
• Regular soil tests should be taken to ensure that the correct fertilisation program is carried<br />
out.<br />
• Grass matting should be avoided <strong>and</strong> always controlled by vertical cutting. Length of grass<br />
should never be longer than 15 mm when played on.