Provisional Sums<br />

165<br />

ITEM DESCRIPTION page AMOUNT R<br />

1<br />

MULTI-PURPOSE SPORTS HALL<br />

SUMMARY<br />

PRELIMINARIES 4 250,000.00<br />

2 FOUNDATIONS 7 636,538.70<br />

3 CONCRETE, FORMWORK & REINFORCEMENT 10 748,252.40<br />

4 MASONRY 13 541,785.25<br />

5 WATERPROOFING 14 45,006.00<br />

6 ROOF COVERINGS 15 118,414.00<br />

7 CARPENTRY & JOINERY 18 196,399.00<br />

8 FLOOR COVERINGS 19 89,644.00<br />

9 IRONMONGERY 20 31,047.50<br />

10 METALWORK 21 273,019.00<br />

11 PLASTERING 24 192,764.00<br />

12 TILING 25 111,994.00<br />

13 PLUMBING 31 154,333.80<br />

14 GLAZING 32 8,788.00<br />

15 PAINTING 33 125,553.00<br />

16 PROVISIONAL SUMS 36 3,549,150.00<br />

SUB-TOTAL<br />

CONTINGENCIES<br />

R 7,072,688.65<br />

Allow an amount of R 300,000.00 (Three hundred thous<strong>and</strong> R<strong>and</strong>) contingency amount to be deducted<br />

in whole or in part as directed by the Project Manager<br />

Item 300,000.00<br />

ESCALATION<br />

Provsion for escalation in terms with published indices to be deducted in part as per detailed<br />

calculation.<br />

Provisional Sums<br />

Item 220,000.00<br />

SUB-TOTAL R 7,592,688.65<br />

Value Added Tax (14%) 1,062,976.41<br />

TOTAL CONTRACT SUM R 8,655,665.06