Provisional Sums<br />
165<br />
ITEM DESCRIPTION page AMOUNT R<br />
1<br />
MULTI-PURPOSE SPORTS HALL<br />
SUMMARY<br />
PRELIMINARIES 4 250,000.00<br />
2 FOUNDATIONS 7 636,538.70<br />
3 CONCRETE, FORMWORK & REINFORCEMENT 10 748,252.40<br />
4 MASONRY 13 541,785.25<br />
5 WATERPROOFING 14 45,006.00<br />
6 ROOF COVERINGS 15 118,414.00<br />
7 CARPENTRY & JOINERY 18 196,399.00<br />
8 FLOOR COVERINGS 19 89,644.00<br />
9 IRONMONGERY 20 31,047.50<br />
10 METALWORK 21 273,019.00<br />
11 PLASTERING 24 192,764.00<br />
12 TILING 25 111,994.00<br />
13 PLUMBING 31 154,333.80<br />
14 GLAZING 32 8,788.00<br />
15 PAINTING 33 125,553.00<br />
16 PROVISIONAL SUMS 36 3,549,150.00<br />
SUB-TOTAL<br />
CONTINGENCIES<br />
R 7,072,688.65<br />
Allow an amount of R 300,000.00 (Three hundred thous<strong>and</strong> R<strong>and</strong>) contingency amount to be deducted<br />
in whole or in part as directed by the Project Manager<br />
Item 300,000.00<br />
ESCALATION<br />
Provsion for escalation in terms with published indices to be deducted in part as per detailed<br />
calculation.<br />
Provisional Sums<br />
Item 220,000.00<br />
SUB-TOTAL R 7,592,688.65<br />
Value Added Tax (14%) 1,062,976.41<br />
TOTAL CONTRACT SUM R 8,655,665.06