SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Plumbing<br />
Plumbing<br />
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />
53 110 mm Vent valve No. 2 65.00 130.00<br />
54 110 mm IE reducing junction. No. 1 120.00 120.00<br />
55 110 mm Cleaning eye. No. 2 65.00 130.00<br />
56 110 mm Gulley trap complete with hopper. No. 1 234.00 234.00<br />
57 160 mm Bend. No. 1 278.00 278.00<br />
58 160 mm Junction. No. 2 384.00 768.00<br />
59 160 mm IE junction. No. 1 420.00 420.00<br />
60 160 mm IE reducing junction.<br />
WATER SUPPLIES<br />
No. 1 420.00 420.00<br />
61 Excavation not exceeding 2.0 m deep for pipe trenches. m3 22 36.00 792.00<br />
62 Back fi lling to pipe trenches.<br />
“Polycop” polypropylene pipes with brass compression fi ttings<br />
m3 22 36.00 792.00<br />
63 25 mm Diameter pipes laid in trenches (trenches elsewhere) m 12 8.00 96.00<br />
64 25 mm Pipes fi xed to walls. m 6 8.00 48.00<br />
65 Extra over “Polycop” pipes for brass compression fi ttings.<br />
Copper Piping<br />
No. 8 32.00 256.00<br />
66 15 mm Diameter pipes chased into walls. m 16 7.00 112.00<br />
67 22 mm Diameter pipes chased into walls. m 6 14.00 84.00<br />
68 22 mm Diameter pipes laid in trenches (trenches elsewhere) m 5 12.00 60.00<br />
69 Extra over copper pipes for capillary fi ttings. No. 15 23.00 345.00<br />
70<br />
Galvanised steel pipes<br />
25 mm Diameter pipes laid in trenches (trenches elsewhere) m 4 68.00 272.00<br />
71 25 mm Pipes fi xed to walls. m 2 72.00 144.00<br />
72 32 mm Diameter pipes laid in trenches (trenches elsewhere) m 15 96.00 1,440.00<br />
73 32 mm Pipes fi xed to walls. m 6 102.00 612.00<br />
74 50 mm Diameter pipes laid in trenches (trenches elsewhere) m 12 120.00 1,440.00<br />
75 50 mm Pipes fi xed to walls. m 1 124.00 124.00<br />
SUB-TOTAL TO COLLECTION R<strong>and</strong> 9,117.00<br />
160