ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />

1<br />

BILL NO. 16<br />

PROVISIONAL SUMS<br />

Unless otherwise described the Preambles <strong>and</strong> full descriptions of the items in the previouse sections will apply equally to this section.<br />

NOTE: The following Prime Cost Amounts are NET <strong>and</strong> do not include any Builder’s Discount. ………………………………………<br />

Sundry Steelwork, Gates, Screens, etc.<br />

Allow the sum of R 75,000.00 for the sundry steelwork<br />

Installation complete. Item 75,000.00<br />

2 Allow for profi t upon above if required. Item 1,875.00<br />

3 Attend upon the sundry steelwork installation fi rm.<br />

Aluminium Windows<br />

Item 1,875.00<br />

4 Allow the sum of R 265,000.00 for the aluminium windows installed Item<br />

complete.<br />

265,000.00<br />

5 Allow for profi t upon above if required. Item 6,625.00<br />

6 Attend upon the aluminium window installation fi rm.<br />

Paraplegic Fittings<br />

Item 6,625.00<br />

7 Allow the sum of R 15,000.00 for the paraplegic fi ttings<br />

installed complete. Item 15,000.00<br />

8 Allow for profi t upon above if required. Item 375.00<br />

9 Attend upon the paraplegic fi ttings installation fi rm.<br />

Change Room Fittings, Built-In-Cupboards, etc.<br />

Item 375.00<br />

10 Allow the sum of R 50,000.00 for the built-in-cupboard installation Item<br />

complete.<br />

50,000.00<br />

11 Allow for profi t upon above if required. Item 1,250.00<br />

12 Attend upon the built-in-cupboard installation fi rm.<br />

Roller Shutter Doors<br />

Item 1,250.00<br />

13 Allow the sum of R 18,000.00 for the roller shutter door installation Item<br />

complete.<br />

18,000.00<br />

14 Allow for profi t upon above if required. Item 450.00<br />

15 Attend upon the roller shutter door installation fi rm. Item 450.00<br />

SUB-TOTAL TO COLLECTION R<strong>and</strong> 444,150.00<br />