SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
27<br />
• Lightly harrow the seed twice in two directions crosswise into the immediate surface.<br />
• Remove any surface stones that may be loosed by this operation <strong>and</strong> fi nally twice roll with<br />
a light fl at roller.<br />
• Water the green as necessary. All seeded areas normally require at least six satisfactory<br />
mowings of the grass before being fi nally cut to a length of 4 mm in the active growing<br />
season.<br />
• Cutting to be done with a 9 – 11 blade per cylinder cylindrical mower.<br />
• Winter Treatment:<br />
Hollow tinning <strong>and</strong> scarifying, followed by top dressing with “Lignitic Fine” (S<strong>and</strong> <strong>and</strong> Organic<br />
Mixture). Winter treatment to be completed before the middle of August each year.<br />
• Remove dry thatch regularly.<br />
Bowls<br />
• Pest control, weeds, algae, fungi <strong>and</strong> damageable insects are to be controlled on an ongoing<br />
basis.<br />
• Cut all surrounds regularly, irrigate as needed <strong>and</strong> fertilise with nitrogen <strong>and</strong> potassium<br />
once every 30 days.<br />
a<br />
51-203mm<br />
b<br />
c<br />
203-381mm<br />
a Green<br />
b Ditch<br />
c Bank<br />
Bowls - construction of green<br />
229mm