SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Carpentry <strong>and</strong> Joinery<br />
153<br />
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />
CEILINGS<br />
White vinyl clad 1200 x 600 x 9.5 mm “rhinoboard” panels on <strong>and</strong> including white powder coated “Donn” exposed tee suspension system<br />
including main <strong>and</strong> cross tees, necessary hangers, grids, wall angles, etc.<br />
12 Ceilings suspended not exceeding 1.0 m below timber trusses. m2 928 128.00 118,784.00<br />
SUB-TOTAL TO COLLECTION R<strong>and</strong> 118,784.00<br />
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />
CARPETRY AND JOINERY<br />
COLLECTION<br />
Total from Page Number 16 77,615.00<br />
Total from Page Number 17 118,784.00<br />
TOTAL TO SUMMARY R<strong>and</strong> 196,399.00<br />
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />
BILL NO. 9<br />
FLOOR COVERINGS, PLASTIC LININGS, ETC.<br />
For preambles see Model Preambles<br />
FLOORS<br />
2.5 mm Semi-fl exible heavy duty vinyl asbestos fl oor sheeting (Colour to Architect’s approval) with welded joints<br />
1 To fl oors.<br />
CARPETS<br />
m2 478 98.00 46,844.00<br />
2 Provide the prime cost amount of R 100.00 per square metre (PC R<br />
100.00/m2) for carpets supplied, delivered to site <strong>and</strong> layed as per<br />
manufacturer’s instructions on cement screeds (elsewhere measured)<br />
m2 350 120.00 42,000.00<br />
3<br />
SUNDRIES<br />
Aluminium cover strip to expansion joints in fl oors pulgged <strong>and</strong><br />
screwed to fl oors.<br />
m 25 32.00 800.00<br />
TOTAL TO SUMMARY R<strong>and</strong> 89,644.00<br />
Floor Coverings<br />
Carpentry <strong>and</strong> Joinery<br />
& Floor Coverings<br />
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT<br />
1<br />
BILL NO. 10<br />
IRONMONGERY<br />
For preambles see Model Preambles as per Preliminaries<br />
SUPPLY AND FIXING OF THE FOLLOWING IRONMONGERY:<br />
“Solid Art 390/311” two lever lockset with door furniture. No. 34 128.00 4,352.00<br />
2 “Solid Art 390/311” three lever lockset with door furniture. No. 16 320.00 5,120.00<br />
3 Rebated double door conversion set. No. 14 165.00 2,310.00<br />
4 120 mm Flush bolt. No. 28 130.00 3,640.00<br />
5 WC indicator bolt. No. 14 80.00 1,120.00<br />
6 “Solid Art 252” coat hook. No. 14 105.00 1,470.00<br />
7 “Solid Art 255/E41” door stop. No. 64 78.00 4,992.00<br />
8 Chrome plated toilet roll holder plugged to walls. No. 14 154.00 2,156.00<br />
9 19 mm Diameter x 750 mm long towel rail pulgged to walls complete<br />
with holder brackets.<br />
No. 8 210.00 1,680.00<br />
10 “Geze 3000V” or other approved door closer No. 6 701.25 4,207.50<br />
TOTAL TO SUMMARY R<strong>and</strong> 31,047.50