FOOTBALL (SOCCER) FIELD<br />
The elemental cost analysis indicated below is based on a football fi eld with a size of 120 m x 90 m<br />
NO. ITEM UNITS QTY RATE R % AMOUNT R TOTALS R<br />
A. SUB-STRUCTURE, ETC. (Provisional)<br />
Removal of Trees (Size ………) No. 1 3,000.00 0.13 3,000.00<br />
Clear site m2 12096 6.00 3.13 72,576.00<br />
Removal of Topsoil incl. Carting Away m3 1210 105.00 5.47 127,050.00<br />
Bulk Earthworks m3 2419 35.00 3.65 84,665.00<br />
Rip & Compact In-Situ Earth to 93 % ModAASHTO m2 12096 6.00 3.13 72,576.00<br />
Herring Bone Sub-Soil Drainage m 2,670 90.00 10.35 240,300.00<br />
Storm Water Reticulation m 30 145.00 0.19 4,350.00<br />
Storm Water Catchpits, etc. No. 5 2,200.00 0.47 11,000.00<br />
Water Supply for Sprinkler System m 420 85.00 1.54 35,700.00<br />
110 mm Diameter Sleeves m 10 120.00 0.05 1,200.00<br />
Automatic Irrigation System m2 12,096 8.00 4.17 96,768.00<br />
Crusher run Base Course m3 1210 230.00 11.99 278,300.00<br />
Coarse River S<strong>and</strong> Layer m2 302 7.00 0.09 2,114.00<br />
Compost m3 605 160.00 4.17 96,768.00<br />
Imported Topsoil (Weed Free) m3 907 130.00 5.08 117,910.00<br />
Levelling <strong>and</strong> Shaping m2 12,096 3.00 1.56 36,288.00<br />
Grass m2 12,096 15.00 7.82 181,440.00<br />
Fertiliser m2 12,096 3.00 1.56 36,288.00 1,498,293.00<br />
B. SPECIALIST ITEMS<br />
Goal Posts No. 2 12,000.00 1.03 24,000.00<br />
Net to Goal Posts No. 2 4,500.00 0.39 9,000.00<br />
Demarcation Lines m 564 12.00 0.29 6,768.00<br />
Scoreboard No. 1 15,000.00 0.65 15,000.00 54,768.00<br />
SUB-TOTALS 66.91 1,553,061.00<br />
PRELIINARIES AND GENERAL 8.03 186,367.00<br />
SUB-TOTALS 74.94 1,739,428.00<br />
CONTINGENCIES % 5 3.75 86,971.00<br />
PROVISION FOR ESCALATION Months 3 1.06 24,656.00<br />
SUB-TOTALS 79.74 1,851,055.00<br />
PROFESSIONAL FEES % 10 7.97 185,106.00<br />
SUB-TOTALS 87.71 2,036,161.00<br />
VALUE ADDED TAX % 14 12.28 285,063.00<br />
FOOTBALL FIELD TOTAL 99.99 2,321,224.00<br />
Note: All fi gures have been rounded up.<br />
Elemental<br />
Costing<br />
136