SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
SASR Norms & Standards Vol 2 new.indd - Sport and Recreation ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Scoring<br />
In every form of golf the goal is to play as few shots as possible. Scores for each hole can be described<br />
as follows:<br />
TERM ON A SCORE<br />
BOARD<br />
SPECIFIC TERM DEFINITION<br />
-4 Condor (Triple Eagle) Four strokes under par<br />
-3 Albatross (Double Eagle) Three strokes under par<br />
-2 Eagle Two strokes under par<br />
-1 Birdie One stroke under par<br />
0 Par Stroke equal to par<br />
+1 Bogey One stroke over par<br />
+2 Double Bogey Two strokes over par<br />
+3 Triple Bogey Three strokes over par<br />
A hole-in-One is scored when a single shot results in the ball falling into the cup. On most golf courses<br />
a par round amounts to a total number of 72 shots played.<br />
Construction of a golfi ng green<br />
The construction of the golfi ng green should be done with great care <strong>and</strong> all materials used should be<br />
chemically <strong>and</strong> physically analysed to ensure that the fi nal product produces a cricket pitch that will<br />
prevent the pitch from disintegrating when used.<br />
• Remove all top soil from the area of the square.<br />
• Excavate out natural earth to a depth of at least 450 mm to Civil Engineering specifi cation.<br />
(Depth may vary dependant on the carrying capacity of the soil)<br />
• Rip <strong>and</strong> compact in-situ earth to 95% modifi ed AASHTO.<br />
Golf<br />
• Install sub-surface drainage comprising 110 mm diameter agricultural drains placed in 450<br />
x 600 mm deep herring bone drainage system at 6 metre intervals <strong>and</strong> to entire perimeter<br />
of the cricket pitch or square.<br />
• Sub-surface drains to be lined with a “Bidum” Hessian layer <strong>and</strong> fi lled in with 19 mm<br />
crusher run stone.<br />
• Sub-Surface drains to connect at the lowest point to a storm water catch pit which should<br />
be connected to a storm water main.<br />
44