126 Part3: Summary <strong>of</strong> country studies – Bangladesh <strong>and</strong> Viet Nam<br />
1. Economic <strong>and</strong> Technical Data<br />
(1). Economic Data<br />
GAS TURBINE: THERMAL MATCH<br />
Fuel Name Diesel<br />
Fuel Net Calorific Value MJ/kg 39<br />
Unit <strong>of</strong> Fuel Purchased (e.g. kg, m 3 , litre) kg<br />
Fuel Purchase Price Peso/kg 2.65<br />
Fuel Price Escalation Rate % 5.0<br />
Boiler O & M Cost (% <strong>of</strong> Boiler Cost) % 5.0<br />
CHP O&M Cost (% <strong>of</strong> Installation Costs) % 2.5<br />
Escalation Rate for O&M Costs % 5.0<br />
St<strong>and</strong>by Capacity kW 500<br />
Insurance Cost (as % <strong>of</strong> book value <strong>of</strong> equipment) % 1.0<br />
Service Life <strong>of</strong> Cogeneration Facilities Years 15<br />
Salvage Value <strong>of</strong> Cogeneration Facilities Peso 0<br />
(2) Technical Data<br />
Heat Dem<strong>and</strong> to be Met by CHP Boiler kg/hr 5,000<br />
Steam Process Pressure Steam Pressure Bar 7<br />
Waste Heat Boiler Efficiency % 65.0<br />
Total Installation Cost Peso 90,828,571<br />
2. Energy Analysis<br />
(1) CHP Power to Heat Ratio kW e /kW th 0.74<br />
(2). Power<br />
kW/(ton/hr Steam) 498.6<br />
Site Electricity Requirement MWh/yr 12,715<br />
Power Generat<strong>in</strong>g Capacity kW 2,493<br />
Electricity Generation MWh/yr 18,673<br />
Deficit(-)/Excess(+ ) Power MWh 5,958<br />
(3). Heat<br />
Site Heat Requirement TJ/yr 158<br />
Heat Generation TJ/yr 103<br />
Heat Utilisation TJ/yr 103<br />
Deficit(-)/Excess(+ ) Heat TJ/yr -55<br />
(4). Fuel<br />
CHP Fuel Consumption TJ/yr 268.9<br />
Fuel Sav<strong>in</strong>g Compared with Conventional Production % 23.9<br />
3. F<strong>in</strong>ancial Analysis<br />
Internal Rate <strong>of</strong> Return % 15.2<br />
Net Present Value Peso 1,218,335<br />
Discounted Pay-back Period Year 14.64<br />
4. Summary: Gas Turb<strong>in</strong>e, Thermal Match<br />
Technical Parameters<br />
Process Steam Pressure Bar 7<br />
Power Generat<strong>in</strong>g Capacity kW 2,493<br />
Steam Generat<strong>in</strong>g Capacity kg/hr 5,000<br />
Power to Heat Ratio 0.74<br />
Energy Analysis Results<br />
kW/(ton/hr Steam) 498.6<br />
Excess (+)/Deficit (-) Power MWh/yr 5,958<br />
Excess (+)/ Deficit(-) Heat TJ/yr -55<br />
F<strong>in</strong>ancial Analysis Results<br />
Internal Rate <strong>of</strong> Return % 15.2<br />
Net Present Value Peso 1,218,335<br />
Discounted Pay-back Period Year 14.64