Summary <strong>of</strong> country study – Viet Nam<br />
There is one big nitrogen fertilizer plant <strong>in</strong> Viet Nam, located <strong>in</strong> Habac prov<strong>in</strong>ce. The plant was<br />
put <strong>in</strong>to operation 30 years ago. The <strong>cogeneration</strong> plant consists <strong>of</strong> five coal-fired boilers: two<br />
large boilers with capacity to produce 75 tons/hour each, <strong>and</strong> three smaller ones, each with a<br />
capacity to produce 35 tons/hour. Steam produced at 40 bar <strong>and</strong> 450°C is <strong>part</strong>ly supplied<br />
directly to the processes, <strong>and</strong> <strong>part</strong>ly through a 6 MW backpressure turb<strong>in</strong>e. In addition, there<br />
are two condens<strong>in</strong>g turb<strong>in</strong>es to meet the plant’s electricity dem<strong>and</strong>, each with a capacity to<br />
produce 6 MW <strong>of</strong> electricity. Like <strong>in</strong> the case <strong>of</strong> most other plants, the performance <strong>of</strong> the<br />
<strong>cogeneration</strong> plant has degraded after long periods <strong>of</strong> operation <strong>and</strong> lack <strong>of</strong> proper<br />
ma<strong>in</strong>tenance. Presently, the boilers have efficiencies rang<strong>in</strong>g from 70 to 75 per cent whereas<br />
the turb<strong>in</strong>e efficiency varies from 24 to 26 per cent only. Though there is plan to rehabilitate<br />
<strong>and</strong> upgrade the exist<strong>in</strong>g facilities, implementation is delayed ma<strong>in</strong>ly due to f<strong>in</strong>ancial<br />
constra<strong>in</strong>ts.<br />
The first unique <strong>cogeneration</strong> system <strong>in</strong> commercial sector <strong>in</strong> Viet Nam was brought <strong>in</strong>to<br />
operation on 18th August 1998 <strong>in</strong> CORA super-market, a member <strong>of</strong> Bourbon group, <strong>in</strong> Dong<br />
Nai prov<strong>in</strong>ce. It consists <strong>of</strong> two diesel generators, each capable <strong>of</strong> produc<strong>in</strong>g 1200 kW. In<br />
addition, there are two absorption chillers, each <strong>of</strong> 600 kW cool<strong>in</strong>g capacity, <strong>and</strong> two electric<br />
chillers, each <strong>of</strong> 400 kW cool<strong>in</strong>g capacity. The ma<strong>in</strong> reason for sett<strong>in</strong>g up this <strong>cogeneration</strong><br />
system is the necessity for reliable power supply. The company is keen to synchronize <strong>its</strong><br />
<strong>cogeneration</strong> plant to the national power grid for system stabilization.<br />
4.2.3 Identification <strong>of</strong> suitable sites for pre-feasibility study<br />
The ma<strong>in</strong> criteria followed for the selection <strong>of</strong> sites for pre-feasibility study are the follow<strong>in</strong>g:<br />
• important consumers <strong>of</strong> electricity <strong>and</strong> heat;<br />
• acceptable heat-to-power ratios;<br />
• will<strong>in</strong>gness <strong>of</strong> the management to apply <strong>cogeneration</strong> technology;<br />
• user has plans for renovation or expansion <strong>of</strong> the exist<strong>in</strong>g facilities;<br />
• management is aware <strong>of</strong> the benef<strong>its</strong> <strong>of</strong> energy conservation <strong>and</strong> efficiency.<br />
Up to now, no study has been done on the sectoral power dem<strong>and</strong> <strong>in</strong> Viet Nam as well as<br />
their load shapes as a function <strong>of</strong> time. In this report, the identification <strong>of</strong> potential study sites<br />
is based on the list <strong>of</strong> consumers (provided by the power utility) which have a dem<strong>and</strong><br />
exceed<strong>in</strong>g 1000 kW, comb<strong>in</strong>ed with the list <strong>of</strong> boiler owners (provided by the Regional<br />
De<strong>part</strong>ments <strong>of</strong> Industrial Safety, M<strong>in</strong>istry <strong>of</strong> Industry).<br />
Rough estimation <strong>of</strong> the steam <strong>and</strong> electricity dem<strong>and</strong> patterns had to be done <strong>in</strong> most cases<br />
as majority <strong>of</strong> factories lack <strong>in</strong>strumentation <strong>and</strong> do not have regular energy monitor<strong>in</strong>g <strong>and</strong><br />
record<strong>in</strong>g facilities.<br />
After the identification <strong>and</strong> direct contact, eight sites <strong>in</strong>clud<strong>in</strong>g factories <strong>and</strong> commercial<br />
build<strong>in</strong>gs were chosen for the pre-feasibility study.<br />
Dur<strong>in</strong>g on-site vis<strong>its</strong> <strong>of</strong> those establishments, questionnaires were filled out <strong>and</strong> direct<br />
discussions were held with the factory management.<br />
165