Summary <strong>of</strong> country study – Bangladesh 141<br />
The fertilizer factory has two boilers with capacities to produce 180 tons/hr <strong>and</strong> 171 ton/hr <strong>of</strong><br />
steam, respectively. The steam generated at 60 bar <strong>and</strong> 510°C is ma<strong>in</strong>ly used <strong>in</strong> two<br />
backpressure steam turb<strong>in</strong>es to generate up to 11 MW <strong>of</strong> electricity. After <strong>part</strong>ial expansion<br />
<strong>in</strong> the turb<strong>in</strong>e, steam at 10 bar is used for process<strong>in</strong>g. Self-power generation <strong>and</strong> thermal<br />
energy consumption data <strong>of</strong> the factory are given <strong>in</strong> Figures 3.6 <strong>and</strong> 3.7, respectively.<br />
Self Power Gen. (MWh)<br />
8000<br />
7000<br />
6000<br />
5000<br />
4000<br />
3000<br />
2000<br />
1000<br />
0<br />
Jan<br />
Feb<br />
Mar<br />
Apr<br />
May<br />
Jun<br />
Jul<br />
Month<br />
Figure 3.6 Self-power generation data <strong>of</strong> the fertilizer factory <strong>in</strong> 1997<br />
Thermal Energy (GJ)<br />
700000<br />
600000<br />
500000<br />
400000<br />
300000<br />
200000<br />
100000<br />
0<br />
Jan<br />
Feb<br />
Mar<br />
Apr<br />
May<br />
Jun<br />
Jul<br />
Month<br />
Figure 3.7 Thermal energy consumption data <strong>of</strong> the fertilizer factory <strong>in</strong> 1997<br />
3.2.3 Assessment <strong>of</strong> the technical potential on the basis <strong>of</strong> questionnaire<br />
A survey <strong>of</strong> the different manufactur<strong>in</strong>g <strong>and</strong> commercial facilities <strong>in</strong> the country us<strong>in</strong>g<br />
technical criteria as def<strong>in</strong>ed by ESCAP’s prelim<strong>in</strong>ary assessment questionnaire allowed to<br />
make a very rough estimation <strong>of</strong> the technical <strong>cogeneration</strong> potential <strong>in</strong> the different subsectors<br />
(see Table 3.3), which amounted to almost 1,000 MW. More precise determ<strong>in</strong>ation<br />
would require more time <strong>and</strong> resources, which was beyond the scope <strong>of</strong> this study.<br />