Sample case study <strong>in</strong> a pulp <strong>and</strong> paper mill 129<br />
SENSITIVITY ANALYSIS<br />
STTM Steam Turb<strong>in</strong>e, Thermal Match, Heat Be<strong>in</strong>g Met: 5000 kg/hr<br />
REPM Reciprocat<strong>in</strong>g Eng<strong>in</strong>e, Power Match. Power Be<strong>in</strong>g Met: 1500 kW<br />
Sensitivity Analysis 3: What-If the Electricity Price Increases?<br />
STTM<br />
REPM<br />
Increment Step 1.00%<br />
Escalation Rate 6.0% 7.0% 8.0% 9.0% 10.0% 11.0% 12.0%<br />
IRR(STTM) 24.3% 25.6% 26.8% 28.0% 29.2% 30.4% 31.5%<br />
IRR(REPM) 19.6% 21.0% 22.3% 23.6% 24.9% 26.2% 27.5%<br />
IRR<br />
30%<br />
25%<br />
20%<br />
15%<br />
10%<br />
IRR vs. Escalation Rate <strong>of</strong> Electricity Price<br />
IRR(STTM)<br />
IRR(REPM)<br />
6% 8% 10% 12% 14%<br />
Escalation Rate <strong>of</strong> Electricity Price