07.04.2013 Views

part 1: overview of cogeneration and its status in asia - Fire

part 1: overview of cogeneration and its status in asia - Fire

part 1: overview of cogeneration and its status in asia - Fire

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Examples <strong>of</strong> <strong>cogeneration</strong> projects implemented <strong>in</strong> Asia 81<br />

The gas turb<strong>in</strong>e consists <strong>of</strong> a 17-stage compressor, combustion system with 10 <strong>in</strong>dividual<br />

combustors, a 3-stage turb<strong>in</strong>e, air systems, lube oil system common to gas turb<strong>in</strong>e <strong>and</strong><br />

generator, cool<strong>in</strong>g water, <strong>and</strong> fuel systems. It is equipped with a steam <strong>in</strong>jection skid for NOx<br />

emission, acoustical enclosure for noise reduction, silenc<strong>in</strong>g equipment on <strong>in</strong>let <strong>and</strong> exhaust<br />

ducts, <strong>and</strong> a CO2 fire protection system.<br />

The HRSG is <strong>of</strong> simple <strong>and</strong> proven design. It has a low thermal <strong>in</strong>ertia to allow fast start-up<br />

<strong>and</strong> rapid load sw<strong>in</strong>gs, high resistance to thermal shocks, low exhaust gas pressure drop,<br />

high heat recovery, <strong>and</strong> high reliability <strong>and</strong> ma<strong>in</strong>ta<strong>in</strong>ability.<br />

2.6.3 F<strong>in</strong>anc<strong>in</strong>g <strong>of</strong> the project<br />

Most <strong>of</strong> the difficulties encountered <strong>in</strong> f<strong>in</strong>anc<strong>in</strong>g large-scale power projects are avoided as the<br />

project is <strong>of</strong> a reasonable size. The f<strong>in</strong>anceability <strong>of</strong> the project is enhanced by the<br />

commitment <strong>and</strong> references <strong>of</strong> the project sponsors as well as the quality <strong>of</strong> the customers.<br />

The project sponsors have large experience <strong>in</strong> energy projects. The <strong>in</strong>dustrial clients are<br />

mostly very much capital <strong>in</strong>tensive <strong>and</strong> are able to take long term <strong>of</strong>f-take commitments.<br />

The electric utility plays an important role by purchas<strong>in</strong>g surplus electricity, thus provid<strong>in</strong>g<br />

stable <strong>and</strong> additional revenue to the project. Also, back-up electricity is provided from the grid,<br />

ensur<strong>in</strong>g that availability targets <strong>of</strong> the <strong>in</strong>dustrial users can be achieved.<br />

The Government has demonstrated a clear policy for privatization <strong>of</strong> power generation along<br />

with accompany<strong>in</strong>g regulations <strong>and</strong> <strong>in</strong>centives.<br />

The equipment suppliers provided necessary confidence <strong>and</strong> guarantees to the lenders <strong>and</strong><br />

guarantors on the follow<strong>in</strong>g:<br />

- project <strong>in</strong>vestment cost control, by accept<strong>in</strong>g the construction <strong>of</strong> the plant for a fixed <strong>and</strong><br />

firm price;<br />

- completion on time, by accept<strong>in</strong>g liquidated damages, for failures to meet targeted<br />

completion date;<br />

- plant performance <strong>in</strong> terms <strong>of</strong> availability <strong>and</strong> reliability, by accept<strong>in</strong>g liquidated damages<br />

for failure to meet targeted figures.<br />

In addition, there was the advantage <strong>of</strong> reduced <strong>in</strong>terest dur<strong>in</strong>g construction due to<br />

progressive <strong>in</strong>vestment <strong>and</strong> short gestation time, <strong>and</strong> the ability to generate <strong>in</strong>come after only<br />

a year <strong>of</strong> sign<strong>in</strong>g the contract when the plant started operat<strong>in</strong>g <strong>in</strong> open cycle.<br />

The debt-equity ratio <strong>of</strong> the project was 3:1. Dur<strong>in</strong>g the f<strong>in</strong>anc<strong>in</strong>g arrangement, maximum<br />

flexibility <strong>in</strong> the choice <strong>of</strong> currency <strong>and</strong> the type <strong>of</strong> <strong>in</strong>terest rates were <strong>of</strong>fered to the<br />

developers. The subsidized loan <strong>in</strong>cluded a 10-year loan term from the commission<strong>in</strong>g date <strong>of</strong><br />

the project. Local f<strong>in</strong>anc<strong>in</strong>g could be made available to cover other <strong>in</strong>vestment costs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!