100 Part3: Summary <strong>of</strong> country studies – Bangladesh <strong>and</strong> Viet<br />
GENERAL INFORMATION<br />
Name <strong>of</strong> the Company:<br />
Address:<br />
Telephone:<br />
Fax:<br />
Contact Name:<br />
Position:<br />
SITE INFORMATION<br />
APPENDIX 1.A<br />
TYPICAL QUESTIONNAIRE FOR INITIAL APPRAISAL OF<br />
COGENERATION POTENTIAL AT A GIVEN SITE<br />
Ma<strong>in</strong> Activity:<br />
Hours <strong>of</strong> Operation:<br />
Work<strong>in</strong>g days:<br />
Total Annual Operat<strong>in</strong>g Hours:<br />
Period <strong>and</strong> Duration <strong>of</strong> Annual Shutdown:<br />
ELECTRICITY DATA (AT LEAST FOR LAST 12 MONTHS)<br />
Year Month Consumption<br />
(MWh)<br />
Transformer Capacity (kVA):<br />
Annual Peak Dem<strong>and</strong> (kW/kVA):<br />
Any changes <strong>in</strong> the future dem<strong>and</strong> patterns expected?<br />
THERMAL REQUIREMENTS (FOR LAST 12 MONTHS)<br />
Peak hours<br />
(MWh)<br />
Steam:<br />
Boiler Outlet Pressure (Bar) <strong>and</strong> Temperature (°C):<br />
Process heat requirement Pressure (Bar) <strong>and</strong> Temperature (°C):<br />
Hot water:<br />
Supply Temperature (°C):<br />
Return Temperature (°C):<br />
Cold/chilled water:<br />
Supply Temperature (°C):<br />
Return Temperature (°C):<br />
Year Month Steam<br />
(ton)<br />
Hot Water<br />
(GJ)<br />
Off-peak hours<br />
(MWh)<br />
Chilled Water<br />
(GJ)