07.04.2013 Views

part 1: overview of cogeneration and its status in asia - Fire

part 1: overview of cogeneration and its status in asia - Fire

part 1: overview of cogeneration and its status in asia - Fire

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

100 Part3: Summary <strong>of</strong> country studies – Bangladesh <strong>and</strong> Viet<br />

GENERAL INFORMATION<br />

Name <strong>of</strong> the Company:<br />

Address:<br />

Telephone:<br />

Fax:<br />

Contact Name:<br />

Position:<br />

SITE INFORMATION<br />

APPENDIX 1.A<br />

TYPICAL QUESTIONNAIRE FOR INITIAL APPRAISAL OF<br />

COGENERATION POTENTIAL AT A GIVEN SITE<br />

Ma<strong>in</strong> Activity:<br />

Hours <strong>of</strong> Operation:<br />

Work<strong>in</strong>g days:<br />

Total Annual Operat<strong>in</strong>g Hours:<br />

Period <strong>and</strong> Duration <strong>of</strong> Annual Shutdown:<br />

ELECTRICITY DATA (AT LEAST FOR LAST 12 MONTHS)<br />

Year Month Consumption<br />

(MWh)<br />

Transformer Capacity (kVA):<br />

Annual Peak Dem<strong>and</strong> (kW/kVA):<br />

Any changes <strong>in</strong> the future dem<strong>and</strong> patterns expected?<br />

THERMAL REQUIREMENTS (FOR LAST 12 MONTHS)<br />

Peak hours<br />

(MWh)<br />

Steam:<br />

Boiler Outlet Pressure (Bar) <strong>and</strong> Temperature (°C):<br />

Process heat requirement Pressure (Bar) <strong>and</strong> Temperature (°C):<br />

Hot water:<br />

Supply Temperature (°C):<br />

Return Temperature (°C):<br />

Cold/chilled water:<br />

Supply Temperature (°C):<br />

Return Temperature (°C):<br />

Year Month Steam<br />

(ton)<br />

Hot Water<br />

(GJ)<br />

Off-peak hours<br />

(MWh)<br />

Chilled Water<br />

(GJ)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!