part 1: overview of cogeneration and its status in asia - Fire
part 1: overview of cogeneration and its status in asia - Fire
part 1: overview of cogeneration and its status in asia - Fire
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Summary <strong>of</strong> country study – Bangladesh 140<br />
expansion <strong>of</strong> the steam <strong>in</strong> turb<strong>in</strong>e a significant amount <strong>of</strong> steam at 6 bar is used by paper<br />
mach<strong>in</strong>e <strong>and</strong> autoclaves. Presently, 13.1 MW is self-generated <strong>and</strong> a 2.5 MW is bought from<br />
the national grid to run the factory <strong>and</strong> provide residential light<strong>in</strong>g. The electrical <strong>and</strong> thermal<br />
energy data <strong>of</strong> the factory for the year 1994 are shown <strong>in</strong> Figures 3.4 <strong>and</strong> 3.5.<br />
MWh (Thous<strong>and</strong>)<br />
12<br />
10<br />
8<br />
6<br />
4<br />
2<br />
0<br />
Jan<br />
Feb<br />
Self Power Generation Purchased power<br />
Mar<br />
Apr<br />
May<br />
Jun<br />
Jul<br />
Month<br />
Figure 3.4 Electricity consumption data <strong>of</strong> the paper mill <strong>in</strong> 1994<br />
Thermal Energy (GJ)<br />
3500<br />
3000<br />
2500<br />
2000<br />
1500<br />
1000<br />
500<br />
0<br />
Jan<br />
Feb<br />
Mar<br />
Apr<br />
May<br />
Jun<br />
Jul<br />
Month<br />
Figure 3.5 Thermal energy consumption data <strong>of</strong> the paper mill <strong>in</strong> 1994<br />
Cogeneration <strong>in</strong> fertilizer plant<br />
This fertilizer factory is one <strong>of</strong> the largest <strong>in</strong> the country, with a capacity to produce over 1.8<br />
million tons <strong>of</strong> urea per year. Ma<strong>in</strong> energy source used <strong>in</strong> this fertilizer factory is natural gas<br />
that is used <strong>in</strong> boilers as fuel. Most <strong>of</strong> the electrical energy used <strong>in</strong> the fertilizer factory is<br />
self-generated <strong>and</strong> there is provision for buy<strong>in</strong>g electricity from the national grid.<br />
Aug<br />
Aug<br />
Sep<br />
Sep<br />
Oct<br />
Oct<br />
Nov<br />
Nov<br />
Dec<br />
Dec