172 Part3: Summary <strong>of</strong> country studies – Bangladesh <strong>and</strong> Viet Nam<br />
With an average power-to-heat ratio <strong>of</strong> 0.14 for the factory, the steam turb<strong>in</strong>e <strong>cogeneration</strong><br />
configuration seems the most suitable. The analysis for the Paper Company “D” was done<br />
with three configurations, <strong>in</strong>clud<strong>in</strong>g steam turb<strong>in</strong>e, reciprocat<strong>in</strong>g eng<strong>in</strong>e <strong>and</strong> gas turb<strong>in</strong>e, <strong>in</strong><br />
order to make a comparison. The <strong>cogeneration</strong> systems that give favourable IRR values are<br />
listed <strong>in</strong> Table 4.7.<br />
Table 4.7 Summary <strong>of</strong> pre-feasibility study <strong>of</strong> the pulp <strong>and</strong> paper mill “E”<br />
Cogeneration Alternatives ALT.1 ALT.2 ALT.3 ALT.4 ALT.5<br />
Configuration S.T. R.E. G.T.<br />
Fuel type Coal H.F.O. N.G.<br />
Fuel price (VND) 280/kg 1,800/kg 1,430/m 3<br />
Electricity purchase price (VND/kWh) 0.87<br />
Buy-back rate (as % <strong>of</strong> purchase price) 70<br />
Electricity price escalation rate<br />
(%/year)<br />
5<br />
Number <strong>of</strong> actual work<strong>in</strong>g hours per year 4,000<br />
Heat generat<strong>in</strong>g capacity (ton/hr) 101.37 129.85 101.37 10.125 25.42<br />
Power Generat<strong>in</strong>g Capacity (kW) 9,989 12,795 9,989 12,795 12,795<br />
Electricity consumption (MWh/year) 87,520<br />
Thermal energy requirement (TJ/year) 1,931<br />
Excess (+)/Deficit (-) heat (TJ/year) 0 295 0 -1,738 -1,447<br />
Excess (+)/Deficit (-) power (MWh/year) -19,197 0 -19,197 0<br />
IRR (%) 37.1 34.9 24.6 40.5 42<br />
Total <strong>in</strong>stallation cost (million VND) 148,729 189,778 148,729 193,166 113,442<br />
Net Present Value (million VND) 220,326 246,662 89,537 113,443 204,056<br />
Pay back Period (year) 5 5 8 4 4<br />
As shown <strong>in</strong> the above summary table, IRR <strong>of</strong> all five consider<strong>in</strong>g alternatives are all very<br />
high.<br />
However, the alternative 4 with the reciprocat<strong>in</strong>g eng<strong>in</strong>e us<strong>in</strong>g heavy fuel oil can be<br />
considered as the best option consider<strong>in</strong>g the IRR <strong>and</strong> the availability <strong>of</strong> fuel supply.<br />
Alternatives 1 <strong>and</strong> 3 need the same <strong>in</strong>vestment but IRR <strong>of</strong> the alternative 1 is higher than that<br />
<strong>of</strong> the alternative 3. Alternative 5 is the most pr<strong>of</strong>itable option with the highest IRR <strong>and</strong> the<br />
lowest <strong>in</strong>vestment cost but natural gas is presently not available at the site.<br />
4.3.6 Rubber factory “H”<br />
Located <strong>in</strong> a District <strong>of</strong> Hanoi, the Company belongs to the Complex Light Industrial “Rubber-<br />
Detergent-Tobacco” Zone. The plant has been <strong>in</strong> operation s<strong>in</strong>ce 1960’s <strong>and</strong> the annual<br />
production <strong>of</strong> the company is more than 1 million sets <strong>of</strong> car tires, 50 million sets <strong>of</strong> bike tires<br />
<strong>and</strong> 100 millions <strong>of</strong> bicycle air tubes. The product quality <strong>of</strong> the factory meets the st<strong>and</strong>ards<br />
<strong>of</strong> many countries <strong>in</strong> the South East Asian region.<br />
The company has plans to exp<strong>and</strong> <strong>its</strong> production <strong>and</strong> <strong>in</strong>crease <strong>its</strong> export earn<strong>in</strong>gs. Moreover,<br />
the exist<strong>in</strong>g boilers operat<strong>in</strong>g with coal as fuel have been <strong>in</strong> operation for 30 years. The<br />
company has high dem<strong>and</strong> for both electricity <strong>and</strong> thermal energy, <strong>and</strong> would like to reduce<br />
<strong>its</strong> annual energy bill that is over 9.3 billion VND.