<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1052 S-1 to 11 except 9 - CAV to VAV<br />

D1053 AH 4 to 7, 10 to 12 - SP Reset<br />

D3032 Monitoring Based Commissioning<br />

BOELTER HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4343<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1959<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

557,218 15.0 10,256 0 320,081 $125,633<br />

291,309 2.0 5,187 0 166,363 $64,659<br />

706,679 81.0 0 75,903 0 $103,868<br />

Basic Gross Area (sf): 373,904<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Office Support<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$358,186 $323,388 $71,637 0.6<br />

Committed Tier:<br />

Backup<br />

$161,132 $166,693 $32,226 0.5<br />

Committed Tier:<br />

Backup<br />

$632,242 $245,506 $386,736 3.7<br />

Totals 1,555,206 98.0 15,443 75,903 486,444 $294,160 $1,151,560 $735,587 $490,599 1.7<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

9,465,400 442,900 25.3 1.2<br />

377.7<br />

9,465,400 442,900 25.3 1.2<br />

377.7<br />

7,521,039 173,960 20.1 0.5<br />

252.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

33.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />