Table 11.1: SEP Projects by Funding Source and Project Type (Continued) Net Simple Payback (yrs) Net Project Cost ($) Gross Estimated Utility Incentive ($) Estimated Project Cost ($) Total Cost Savings ($/yr) Total Purchased Gas Savings (th/yr) Demand Savings (kW) $ 18,814 $ 68,191 $ 51,311 $ 16,880 0.9 - 27.0 $ 13,619 $ 66,753 $ 37,144 $ 29,609 2.2 - 18.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 Total Purchased SEP Electricity Project Building Savings ID Key Building Name Project Name (kWh/yr) LCD Phase 1 of 9: 1000 Verdiem (PC Power Management) D3109 04CWIDE CAMPUSWIDE Installations and 40 CRT Replacements 213,796 Refrigerators Phase 7 of 7: 69 <strong>Energy</strong> Star Refrigerator D3108 04CWIDE CAMPUSWIDE Replacements 154,767 Refrigerators Phase 6 of 7: 100 <strong>Energy</strong> Star Refrigerator D3107 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 5 of 7: 100 <strong>Energy</strong> Star Refrigerator D3106 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 4 of 7: 100 <strong>Energy</strong> Star Refrigerator D3105 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 3 of 7: 100 <strong>Energy</strong> Star Refrigerator D3104 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 2 of 7: 100 <strong>Energy</strong> Star Refrigerator D3103 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 1 of 7: 100 <strong>Energy</strong> Star Refrigerator D3102 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 5 of 5: 73 <strong>Energy</strong> Star Refrigerator D3101 04CWIDE CAMPUSWIDE Replacements 163,739 Refrigerators Phase 4 of 5: 100 <strong>Energy</strong> Star Refrigerator D3100 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 3 of 5: 100 <strong>Energy</strong> Star Refrigerator D3099 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 2 of 5: 100 <strong>Energy</strong> Star Refrigerator D3098 04CWIDE CAMPUSWIDE Replacements 224,300 Refrigerators Phase 1 of 5: 100 <strong>Energy</strong> Star Refrigerator D3097 04CWIDE CAMPUSWIDE Replacements 224,300 D3096 04CWIDE CAMPUSWIDE Lab Freezers Phase 4 of 4: 6 Lab Freezer Replacements 23,184 D3095 04CWIDE CAMPUSWIDE Lab Freezers Phase 3 of 4: 20 Lab Freezer Replacements 77,280 D3094 04CWIDE CAMPUSWIDE Lab Freezers Phase 2 of 4: 20 Lab Freezer Replacements 77,280 D3093 04CWIDE CAMPUSWIDE Lab Freezers Phase 1 of 4: 20 Lab Freezer Replacements 77,280 Subtotal, State Funded, Other Projects 6,364,652 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 14,409 $ 70,622 $ 39,297 $ 31,325 2.2 - 19.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 - 26.0 $ 19,738 $ 96,743 $ 53,832 $ 42,911 2.2 $ 2,040 $ 116,424 $ 5,564 $ 110,860 54.3 $ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3 $ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3 $ 6,801 $ 388,080 $ 18,547 $ 369,533 54.3 $ 560,089 $ 4,586,700 $ 1,521,237 $ 3,065,463 5.5 - - - - - - 26.0 3.0 9.0 9.0 9.0 707.0 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 Savings by Design (SBD) - Deferred Maintenance & Capital Renewal Projects D3075 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2014 177,272 Second Electric Savings Component of DM and CR Projects D3074 04CWIDE CAMPUSWIDE 2014 454,550 $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 D3073 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2014 454,550 D3072 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2013 177,272 Second Electric Savings Component of DM and CR Projects D3071 04CWIDE CAMPUSWIDE 2013 454,550 $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 D3070 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2013 454,550 D3069 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2012 177,272 Second Electric Savings Component of DM and CR Projects D3068 04CWIDE CAMPUSWIDE 2012 454,550 $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 D3067 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2012 454,550 D3066 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2011 177,272 Second Electric Savings Component of DM and CR Projects D3065 04CWIDE CAMPUSWIDE 2011 454,550 $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 D3064 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2011 454,550 D3063 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2010 177,272 Second Electric Savings Component of DM and CR Projects D3062 04CWIDE CAMPUSWIDE 2010 454,550
Table 11.1: SEP Projects by Funding Source and Project Type (Continued) Net Simple Payback (yrs) Net Project Cost ($) Gross Estimated Utility Incentive ($) Estimated Project Cost ($) Total Cost Savings ($/yr) Total Purchased Gas Savings (th/yr) Demand Savings (kW) Total Purchased Electricity Savings (kWh/yr) Building Key Building Name Project Name SEP Project ID $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 $ 15,600 $ 346,500 $ 28,409 $ 318,091 20.4 - - 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 - 52.0 D3061 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2010 454,550 D3060 04CWIDE CAMPUSWIDE Natural Gas Component of DM and CR Projects 2009 177,272 Second Electric Savings Component of DM and CR Projects D3059 04CWIDE CAMPUSWIDE 2009 454,550 D3058 04CWIDE CAMPUSWIDE First Electric Savings Component of DM and CR Projects 2009 454,550 52.0 - $ 40,000 $ 693,000 $ 109,092 $ 583,908 14.6 Subtotal, State Funded, (SBD) - Deferred Maintenance & Capital Renewal Projects 6,518,233 624.0 - $ 573,605 $ 10,395,000 $ 1,479,558 $ 8,915,442 15.5 Subtotal, State Funded Projects 89,108,065 8,885.0 - $ 7,841,510 $ 83,561,782 $ 20,210,063 $ 63,351,719 8.1 $ 14,078 $ 97,379 $ 33,276 $ 64,103 4.6 $ 6,074 $ 34,700 $ 11,858 $ 22,842 3.8 $ 65,310 $ 373,119 $ 127,499 $ 245,620 3.8 $ 68,130 $ 389,234 $ 133,006 $ 256,228 3.8 $ 11,625 $ 78,750 $ 24,000 $ 54,750 4.7 $ 3,336 $ 20,587 $ 6,210 $ 14,377 4.3 $ 168,553 $ 993,770 $ 335,849 $ 657,921 3.9 - 4,583 49,274 51,401 7,500 2,813 115,570 11.0 4.0 42.0 44.0 9.0 2.0 112.0 Med <strong>Center</strong> Funded Buildings MBCx Projects D3501 04C4006 MED PLZA 100 Monitoring Based Commissioning 159,980 D3503 04C510B SMH EMERGCY Monitoring Based Commissioning 34,132 D3505 04C510D SMH PAVILION Monitoring Based Commissioning 367,002 D3507 04C510F SMH WST TOWR Monitoring Based Commissioning 382,854 D3510 04C510H SMH CENT PLT MBCx Central <strong>Plan</strong>t 75,000 D3509 04C510H SMH CENT PLT Monitoring Based Commissioning 16,499 Subtotal, Med <strong>Center</strong> Funded, MBCx Projects 1,035,467 New Construction D3001 04C4006 MED PLZA 100 100 SBD, New/Renov New/Renov - Outpatient Wing Wing Seismic Renovation Renovation 615,049 44.0 - $ 54,124 $ 645,613 $ 129,516 $ 516,097 9.5 SBD, New/Renov - Santa Monica/Orthopaedic Replacement D3044 04C510F SMH WST TOWR Hospital and Parking Structure 2,748,782 314.0 163,728 $ 351,590 $ 3,637,434 $ 790,690 $ 2,846,744 8.1 $ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5 - 3.0 D3088 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5 - 3.0 D3087 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 $ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5 - 3.0 D3086 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 D3085 04CWIDEM CAMPUSWIDE - MED CTR SBD, New/Renov - <strong>Campus</strong> Approved Projects Under $5 Million 44,646 3.0 - $ 3,929 $ 46,867 $ 9,401 $ 37,466 9.5 Subtotal, Med <strong>Center</strong> Funded, New Construction 3,542,413 370.0 163,728 $ 421,430 $ 4,470,516 $ 957,810 $ 3,512,706 8.3 Subtotal, Med <strong>Center</strong> Funded Projects 4,577,880 482.0 279,298 $ 589,983 $ 5,464,286 $ 1,293,659 $ 4,170,627 7.1 $ 7,177 $ 48,381 $ 16,584 $ 31,797 4.4 $ 13,472 $ 90,818 $ 31,130 $ 59,688 4.4 $ 18,069 $ 121,803 $ 41,751 $ 80,052 4.4 $ 8,882 $ 59,875 $ 20,523 $ 39,352 4.4 $ 12,410 $ 83,659 $ 28,676 $ 54,983 4.4 $ 60,010 $ 404,536 $ 138,664 $ 265,872 4.4 - - - - - - 5.0 9.0 13.0 6.0 9.0 42.0 Housing Funded MBCx D3015 04C4265 TIVERTON HSE Monitoring Based Commissioning 81,558 D3019 04C4302A CANYON POINT Monitoring Based Commissioning 153,094 D3020 04C4302D COVEL COMMON Monitoring Based Commissioning 205,324 D3021 04C4310 KERCKHOFF Monitoring Based Commissioning 100,932 D3036 04C4352 SYCAMORE CT Monitoring Based Commissioning 141,026 Subtotal, Housing, MBCx 681,934 $ 6,398 $ 67,157 $ 15,310 $ 51,847 8.1 $ 171,648 $ 1,750,813 $ 432,481 $ 1,318,332 7.7 $ 68,403 $ 718,016 $ 163,684 $ 554,332 8.1 $ 63,886 $ 670,602 $ 152,875 $ 517,727 8.1 $ 19,296 $ 202,549 $ 46,174 $ 156,375 8.1 - - - - - 5.0 172.0 56.0 52.0 16.0 $ 12,190 $ 127,950 $ 29,169 $ 98,781 8.1 - 10.0 $ 294,648 $ 3,092,901 $ 705,077 $ 2,387,824 8.1 $ 636,469 $ 6,629,988 $ 1,544,770 $ 5,085,218 8.0 - - 241.0 552.0 New Construction D3002 04C4201 ARWHD LODGE SBD, New/Renov - Lake Arrowhead Facility Improvements 72,707 D3012 04C4246 DYKSTRA HALL SBD, New/Renov - Dykstra Repairs and Refurbishment 1,950,545 D3017 04C4298 RIEBER HALL SBD, New/Renov - Rieber Repairs and Refurbishment 777,303 D3018 04C4299 HEDRICK HALL SBD, New/Renov - Hedrick Repairs and Refurbishment 725,977 D3053 04CTBD3 HILGARD GRAD STUD SBD, New/Renov - Hilgard Graduate Student Housing 219,273 SOUTHWEST CAMPUS SBD, New/Renov - Southwest <strong>Campus</strong> Housing Commons D3054 04CTBD4 HOUSING COMMONS Building 138,519 NORTHWEST CAMPUS D3057 04CTBD7 STUDENT HOUSING BUILDING SBD, New/Renov - Northwest <strong>Campus</strong> Student Housing Unit 3,348,278 Subtotal, Housing, New Construction 7,232,601
- Page 1:
UC STRATEGIC ENERGY PLAN University
- Page 4 and 5:
TABLE OF CONTENTS (CONTINUED) 12. E
- Page 7 and 8:
1. EXECUTIVE SUMMARY 1.1 Policy on
- Page 9 and 10:
Table 1.1: Summary of Baseline and
- Page 11:
The campus has reviewed a prelimina
- Page 14 and 15:
Construction costs of recommended p
- Page 16 and 17:
Campus Los Angeles Santa Monica Hos
- Page 18 and 19:
2.3 Campus Overview University of C
- Page 20 and 21:
Table 2.4: SEP Buildings (Continued
- Page 23:
3. HISTORICAL CAMPUS ENERGY USE 3.1
- Page 26 and 27:
4.2 Individual Building Metering Bu
- Page 28 and 29:
of UCSD buildings is shown in Figur
- Page 31:
5. UTILITIES 5.1 Providers & Tariff
- Page 35 and 36:
7. RENEWABLE ENERGY GENERATION 7.1
- Page 37 and 38:
8. RECOMMENDED ENERGY EFFICIENCY PR
- Page 39 and 40:
One campus, UC Santa Barbara, has c
- Page 41 and 42:
The controllers themselves are prog
- Page 43 and 44:
8.2.3 Air Handler Project 3. Demand
- Page 45 and 46:
standard control sequence. Temperat
- Page 47 and 48:
8.2.11 Laboratory Air Handler Proje
- Page 49 and 50:
The projected MBCx energy savings f
- Page 51 and 52:
The budget that each campus has to
- Page 53 and 54:
8.7 Other Projects 8.7.1 Swimming P
- Page 55 and 56:
8.8.3 UCLA Custom Project 3. TOD Co
- Page 57:
9. BUILDING OVERVIEW & PROJECTS The
- Page 60 and 61:
Strategic Energy Plan Projects SEP
- Page 62 and 63:
Strategic Energy Plan Projects SEP
- Page 64 and 65:
Strategic Energy Plan Projects SEP
- Page 66 and 67:
2006-2008 Partnership Projects Stra
- Page 68 and 69:
Strategic Energy Plan Projects SEP
- Page 70 and 71:
Strategic Energy Plan Projects SEP
- Page 72 and 73:
Strategic Energy Plan Projects SEP
- Page 74 and 75:
Strategic Energy Plan Projects SEP
- Page 76 and 77:
Strategic Energy Plan Projects SEP
- Page 78 and 79:
Strategic Energy Plan Projects SEP
- Page 80 and 81:
Strategic Energy Plan Projects SEP
- Page 82 and 83:
Strategic Energy Plan Projects SEP
- Page 84 and 85:
Strategic Energy Plan Projects SEP
- Page 86 and 87:
Strategic Energy Plan Projects SEP
- Page 88 and 89:
Strategic Energy Plan Projects SEP
- Page 90 and 91:
Strategic Energy Plan Projects SEP
- Page 92 and 93:
Strategic Energy Plan Projects SEP
- Page 94 and 95:
Strategic Energy Plan Projects SEP
- Page 96 and 97:
Strategic Energy Plan Projects SEP
- Page 98 and 99:
Strategic Energy Plan Projects SEP
- Page 100 and 101:
Strategic Energy Plan Projects SEP
- Page 102 and 103:
Strategic Energy Plan Projects SEP
- Page 104 and 105:
Strategic Energy Plan Projects SEP
- Page 106 and 107:
Strategic Energy Plan Projects SEP
- Page 108 and 109:
Strategic Energy Plan Projects SEP
- Page 110 and 111:
Strategic Energy Plan Projects SEP
- Page 112 and 113:
Strategic Energy Plan Projects SEP
- Page 114 and 115:
Strategic Energy Plan Projects SEP
- Page 116 and 117:
Strategic Energy Plan Projects SEP
- Page 118 and 119:
Strategic Energy Plan Projects SEP
- Page 120 and 121:
Strategic Energy Plan Projects SEP
- Page 122 and 123:
Strategic Energy Plan Projects SEP
- Page 124 and 125:
Strategic Energy Plan Projects SEP
- Page 126 and 127:
Strategic Energy Plan Projects SEP
- Page 128 and 129:
Strategic Energy Plan Projects SEP
- Page 130 and 131:
Strategic Energy Plan Projects SEP
- Page 132 and 133:
Strategic Energy Plan Projects SEP
- Page 135 and 136:
PROJECT DETAIL REPORT SEP Project I
- Page 137 and 138:
PROJECT DETAIL REPORT SEP Project I
- Page 139:
PROJECT DETAIL REPORT SEP Project I
- Page 142 and 143:
City: Los Angeles City Index Materi
- Page 144 and 145:
PROJECT DETAIL REPORT SEP Project I
- Page 147 and 148:
PROJECT DETAIL REPORT SEP Project I
- Page 149 and 150:
PROJECT DETAIL REPORT SEP Project I
- Page 151 and 152:
PROJECT DETAIL REPORT SEP Project I
- Page 153 and 154:
City: Los Angeles City Index Materi
- Page 155 and 156:
PROJECT DETAIL REPORT SEP Project I
- Page 157 and 158:
PROJECT DETAIL REPORT SEP Project I
- Page 159 and 160:
PROJECT DETAIL REPORT SEP Project I
- Page 161 and 162:
PROJECT DETAIL REPORT SEP Project I
- Page 163 and 164:
PROJECT DETAIL REPORT SEP Project I
- Page 165 and 166:
PROJECT DETAIL REPORT SEP Project I
- Page 167 and 168:
PROJECT DETAIL REPORT SEP Project I
- Page 169 and 170:
PROJECT DETAIL REPORT SEP Project I
- Page 171 and 172:
PROJECT DETAIL REPORT SEP Project I
- Page 173 and 174:
PROJECT DETAIL REPORT SEP Project I
- Page 175 and 176:
PROJECT DETAIL REPORT SEP Project I
- Page 177 and 178:
PROJECT DETAIL REPORT SEP Project I
- Page 179 and 180:
PROJECT DETAIL REPORT SEP Project I
- Page 181 and 182:
PROJECT DETAIL REPORT SEP Project I
- Page 183 and 184:
PROJECT DETAIL REPORT SEP Project I
- Page 185 and 186:
PROJECT DETAIL REPORT SEP Project I
- Page 187 and 188:
PROJECT DETAIL REPORT SEP Project I
- Page 189 and 190:
PROJECT DETAIL REPORT SEP Project I
- Page 191 and 192:
PROJECT DETAIL REPORT SEP Project I
- Page 193 and 194:
PROJECT DETAIL REPORT SEP Project I
- Page 195 and 196:
PROJECT DETAIL REPORT SEP Project I
- Page 197 and 198:
PROJECT DETAIL REPORT SEP Project I
- Page 199 and 200:
PROJECT DETAIL REPORT SEP Project I
- Page 201 and 202:
PROJECT DETAIL REPORT SEP Project I
- Page 203:
PROJECT DETAIL REPORT SEP Project I
- Page 206 and 207:
City: Los Angeles City Index Materi
- Page 208 and 209:
PROJECT DETAIL REPORT SEP Project I
- Page 210 and 211:
PROJECT DETAIL REPORT SEP Project I
- Page 212 and 213:
PROJECT DETAIL REPORT SEP Project I
- Page 214 and 215:
PROJECT DETAIL REPORT SEP Project I
- Page 216 and 217:
PROJECT DETAIL REPORT SEP Project I
- Page 218 and 219:
PROJECT DETAIL REPORT SEP Project I
- Page 220 and 221:
PROJECT DETAIL REPORT SEP Project I
- Page 222 and 223:
PROJECT DETAIL REPORT SEP Project I
- Page 224 and 225:
PROJECT DETAIL REPORT SEP Project I
- Page 226 and 227:
PROJECT DETAIL REPORT SEP Project I
- Page 228 and 229:
PROJECT DETAIL REPORT SEP Project I
- Page 230 and 231:
PROJECT DETAIL REPORT SEP Project I
- Page 232 and 233:
PROJECT DETAIL REPORT SEP Project I
- Page 234 and 235:
PROJECT DETAIL REPORT SEP Project I
- Page 236 and 237:
PROJECT DETAIL REPORT SEP Project I
- Page 238 and 239:
PROJECT DETAIL REPORT SEP Project I
- Page 240 and 241:
PROJECT DETAIL REPORT SEP Project I
- Page 242 and 243:
PROJECT DETAIL REPORT SEP Project I
- Page 244 and 245:
PROJECT DETAIL REPORT SEP Project I
- Page 246 and 247:
PROJECT DETAIL REPORT SEP Project I
- Page 248 and 249:
PROJECT DETAIL REPORT SEP Project I
- Page 250 and 251:
PROJECT DETAIL REPORT SEP Project I
- Page 252 and 253:
PROJECT DETAIL REPORT SEP Project I
- Page 254 and 255:
PROJECT DETAIL REPORT SEP Project I
- Page 256 and 257:
PROJECT DETAIL REPORT SEP Project I
- Page 258 and 259:
PROJECT DETAIL REPORT SEP Project I
- Page 260 and 261:
PROJECT DETAIL REPORT SEP Project I
- Page 262 and 263:
PROJECT DETAIL REPORT SEP Project I
- Page 264 and 265:
PROJECT DETAIL REPORT SEP Project I
- Page 266 and 267:
PROJECT DETAIL REPORT SEP Project I
- Page 268 and 269:
PROJECT DETAIL REPORT SEP Project I
- Page 270 and 271:
PROJECT DETAIL REPORT SEP Project I
- Page 272 and 273:
PROJECT DETAIL REPORT SEP Project I
- Page 274 and 275:
PROJECT DETAIL REPORT SEP Project I
- Page 276 and 277:
PROJECT DETAIL REPORT SEP Project I
- Page 278 and 279:
PROJECT DETAIL REPORT SEP Project I
- Page 280 and 281:
PROJECT DETAIL REPORT SEP Project I
- Page 282 and 283:
PROJECT DETAIL REPORT SEP Project I
- Page 284 and 285:
PROJECT DETAIL REPORT SEP Project I
- Page 286 and 287:
PROJECT DETAIL REPORT SEP Project I
- Page 288 and 289:
PROJECT DETAIL REPORT SEP Project I
- Page 290 and 291:
PROJECT DETAIL REPORT SEP Project I
- Page 292 and 293:
PROJECT DETAIL REPORT SEP Project I
- Page 294 and 295:
PROJECT DETAIL REPORT SEP Project I
- Page 296 and 297:
PROJECT DETAIL REPORT SEP Project I
- Page 298 and 299:
PROJECT DETAIL REPORT SEP Project I
- Page 300 and 301:
PROJECT DETAIL REPORT SEP Project I
- Page 302 and 303:
PROJECT DETAIL REPORT SEP Project I
- Page 304 and 305:
PROJECT DETAIL REPORT SEP Project I
- Page 306 and 307:
PROJECT DETAIL REPORT SEP Project I
- Page 308 and 309:
PROJECT DETAIL REPORT SEP Project I
- Page 310 and 311:
PROJECT DETAIL REPORT SEP Project I
- Page 312 and 313:
PROJECT DETAIL REPORT SEP Project I
- Page 314 and 315:
PROJECT DETAIL REPORT SEP Project I
- Page 316 and 317:
PROJECT DETAIL REPORT SEP Project I
- Page 318 and 319:
PROJECT DETAIL REPORT SEP Project I
- Page 320 and 321:
PROJECT DETAIL REPORT SEP Project I
- Page 322 and 323:
PROJECT DETAIL REPORT SEP Project I
- Page 324 and 325:
PROJECT DETAIL REPORT SEP Project I
- Page 326 and 327:
PROJECT DETAIL REPORT SEP Project I
- Page 328 and 329:
PROJECT DETAIL REPORT SEP Project I
- Page 330 and 331:
PROJECT DETAIL REPORT SEP Project I
- Page 332 and 333:
PROJECT DETAIL REPORT SEP Project I
- Page 334 and 335:
PROJECT DETAIL REPORT SEP Project I
- Page 336 and 337:
PROJECT DETAIL REPORT SEP Project I
- Page 338 and 339:
PROJECT DETAIL REPORT SEP Project I
- Page 340 and 341:
PROJECT DETAIL REPORT SEP Project I
- Page 342 and 343:
PROJECT DETAIL REPORT SEP Project I
- Page 344 and 345:
PROJECT DETAIL REPORT SEP Project I
- Page 346 and 347:
PROJECT DETAIL REPORT SEP Project I
- Page 348 and 349:
PROJECT DETAIL REPORT SEP Project I
- Page 350 and 351:
PROJECT DETAIL REPORT SEP Project I
- Page 352 and 353:
PROJECT DETAIL REPORT SEP Project I
- Page 354 and 355:
PROJECT DETAIL REPORT SEP Project I
- Page 356 and 357:
PROJECT DETAIL REPORT SEP Project I
- Page 358 and 359:
PROJECT DETAIL REPORT SEP Project I
- Page 360 and 361:
PROJECT DETAIL REPORT SEP Project I
- Page 362 and 363:
PROJECT DETAIL REPORT SEP Project I
- Page 364 and 365:
PROJECT DETAIL REPORT SEP Project I
- Page 366 and 367:
PROJECT DETAIL REPORT SEP Project I
- Page 368 and 369: PROJECT DETAIL REPORT SEP Project I
- Page 370 and 371: PROJECT DETAIL REPORT SEP Project I
- Page 372 and 373: PROJECT DETAIL REPORT SEP Project I
- Page 374 and 375: PROJECT DETAIL REPORT SEP Project I
- Page 376 and 377: PROJECT DETAIL REPORT SEP Project I
- Page 378 and 379: PROJECT DETAIL REPORT SEP Project I
- Page 380 and 381: PROJECT DETAIL REPORT SEP Project I
- Page 382 and 383: PROJECT DETAIL REPORT SEP Project I
- Page 384 and 385: PROJECT DETAIL REPORT SEP Project I
- Page 386 and 387: PROJECT DETAIL REPORT SEP Project I
- Page 388 and 389: PROJECT DETAIL REPORT SEP Project I
- Page 390 and 391: PROJECT DETAIL REPORT SEP Project I
- Page 392 and 393: PROJECT DETAIL REPORT SEP Project I
- Page 394 and 395: PROJECT DETAIL REPORT SEP Project I
- Page 396 and 397: PROJECT DETAIL REPORT SEP Project I
- Page 398 and 399: PROJECT DETAIL REPORT SEP Project I
- Page 400 and 401: PROJECT DETAIL REPORT SEP Project I
- Page 402 and 403: PROJECT DETAIL REPORT SEP Project I
- Page 404 and 405: PROJECT DETAIL REPORT SEP Project I
- Page 406 and 407: PROJECT DETAIL REPORT SEP Project I
- Page 408 and 409: PROJECT DETAIL REPORT SEP Project I
- Page 410 and 411: PROJECT DETAIL REPORT SEP Project I
- Page 413 and 414: 11. PROJECT LISTS & SUMMARY OF PROJ
- Page 415 and 416: Table 11.1: SEP Projects by Funding
- Page 417: Table 11.1: SEP Projects by Funding
- Page 421: Table 11.1: SEP Projects by Funding
- Page 424 and 425: educing growth adjusted electricity
- Page 426 and 427: step within the Strategic Energy Pl
- Page 429: Appendix A Field Data Forms (Electr
- Page 433: Appendix C Other Calculations and D