24.07.2013 Views

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 3 VIV to VAV & SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: WOODEN/PS4<br />

Building Key: 04C4235<br />

Basic Gross Area (sf): 707,839<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1029<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

58,384<br />

1.0<br />

0<br />

24,388<br />

434<br />

Equipment Description Qty<br />

\28. Woodenps4\2. <strong>UC</strong>LA CVRH_VAV Woodenps4 AHU 3 VIV to VAV SP reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume, Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers & Air Handler Project 6. Convert Air Handlers to<br />

Direct Digital Control.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr): 77,894<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

5,425<br />

Extended Bare<br />

Labor Cost ($)<br />

$24,120<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

30 hp VFD 1 $4,775.00 $4,894 $1,100.00 $1,233<br />

VIV Removal 16 $0.00 $0 $100.00 $1,794<br />

License Fee (estimated per 1000 CFM) 26 $0.00 $0 $56.00 $1,632<br />

15 hp VFD 1 $2,275.00 $2,332 $820.00<br />

$919<br />

SAV with InCite 1 $4,500.00 $4,613 $7,150.00 $8,015<br />

CAV - RH to VAV - RH (17 points) 1 $8,956.10 $9,180 $5,459.41 $6,120<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$21,019 $19,713<br />

$1,734<br />

$2,730<br />

$25,483<br />

$2,548<br />

$7,848<br />

$2,616<br />

$3,139<br />

N/A<br />

$2,366<br />

$22,079<br />

$2,208<br />

Totals: $28,031 $24,287<br />

Total Project Cost: $65,921<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $65,921<br />

Rebate/Incentive*:<br />

$24,120<br />

Net Project Cost: $41,801<br />

Net Simple Payback Period (yrs): 4.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

103,025<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

0<br />

$9,066

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!