<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1027 AHU 1 & 2 SP Reset<br />

D3016 Monitoring Based Commissioning<br />

D6006 Replace Chiller<br />

WILSHIRE CTR<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4270<br />

Funding Source: OTHER<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1981<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

736,319 171.0 0 0 0 $64,796<br />

242,710 28.0 0 33,097 0 $39,533<br />

304,707 98.0 0 0 0 $26,814<br />

Basic Gross Area (sf): 455,912<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Retail<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$1,729,872 $176,717 $1,553,155 24.0<br />

Committed Tier:<br />

Backup<br />

$266,496 $91,347 $175,149 4.4<br />

Committed Tier:<br />

Backup<br />

$847,454 $73,130 $774,324 28.9<br />

Totals 1,283,736 297.0 0 33,097 0 $131,143 $2,843,822 $341,194 $2,502,628 19.1<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

3,989,800 186,700 8.8 0.4<br />

130.6<br />

3,989,800 186,700 8.8 0.4<br />

130.6<br />

2,706,064 153,603 5.9 0.3<br />

94.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

27.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th