PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 3 5 & SF-1 CAV to VAV with SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: SOUTHERN REGIONAL LIBRARY FACI<br />

Building Key: 04C4562<br />

Basic Gross Area (sf): 228,306<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1026<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

89,403<br />

4.0<br />

0<br />

0<br />

925<br />

Equipment Description Qty<br />

\26. Sourthern Regional Library FAC\2. <strong>UC</strong>LA CVRH_VAV SRLF AHU 3, 5, SF-1 CAV to VAV SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume & Air Handler Project 4.<br />

Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

89,403<br />

11,563<br />

Extended Bare<br />

Labor Cost ($)<br />

$33,019<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 3 $4,500.00 $13,838 $7,150.00 $24,045<br />

Dart @ Zone 6 $0.00 $0 $56.00<br />

$377<br />

License Fee (estimated per 1000 CFM) 11 $0.00 $0 $56.00<br />

$691<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

2 hp VFD 1 $700.00 $718 $400.00<br />

$448<br />

Dart Control 3 $8,710.00 $26,783 $2,900.00 $9,753<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$45,387 $36,536<br />

$3,744<br />

$5,896<br />

$55,027<br />

$5,503<br />

$15,831<br />

$5,277<br />

$6,333<br />

N/A<br />

$4,384<br />

$40,920<br />

$4,092<br />

Totals: $60,530 $45,012<br />

Total Project Cost: $132,983<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $132,983<br />

Rebate/Incentive*:<br />

$33,019<br />

Net Project Cost: $99,964<br />

Net Simple Payback Period (yrs): 7.7<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

147,123<br />

0<br />

$12,947<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.