UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

COVEL COMMON<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4302D<br />

Funding Source: HOUSING<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

D1006 DAC 1 to 4 & DAHU-1 - VIV to VAV SP Reset<br />

D3020 Monitoring Based Commissioning<br />

D6002 Replace Boiler<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1992<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

287,180 2.0 0 16,383 0 $34,268<br />

110,932 13.0 0 15,127 0 $18,069<br />

0 0.0 0 4,987 0 $2,738<br />

Basic Gross Area (sf): 144,067<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Food Service<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$105,987 $85,306 $21,197 0.6<br />

Committed Tier:<br />

Backup<br />

$121,803 $41,751 $80,052 4.4<br />

Committed Tier:<br />

Backup<br />

$156,646 $4,987 $151,659 55.4<br />

Totals 398,112 15.0 0 36,497 0 $55,075 $384,435 $132,044 $252,908 4.6<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,823,500 85,300 12.7 0.6<br />

188.8<br />

1,823,500 85,300 12.7 0.6<br />

188.8<br />

1,425,388 48,803 9.9 0.3<br />

135.2<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.4%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />