City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$752,453 $798,505<br />

$62,077<br />

$97,744<br />

$912,273<br />

$91,227<br />

$298,089<br />

$99,363<br />

$119,236<br />

N/A<br />

$95,821<br />

$894,326<br />

$89,433<br />

Totals: $1,003,501 $983,758<br />

Total Project Cost: $2,503,946<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $2,503,946<br />

Rebate/Incentive*:<br />

$215,086<br />

Net Project Cost: $2,288,860<br />

Net Simple Payback Period (yrs): 27.9<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

933,010<br />

0<br />

$82,105<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.