<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1004 AHU 4 SP Reset<br />

D1024 AHU1 to 6 SP Reset<br />

D3037 Monitoring Based Commissioning<br />

SAC<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4360<br />

Funding Source: OTHER<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1932<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

32,518 0.0 512 0 17,290 $6,769<br />

116,981 1.0 1,640 0 70,765 $23,784<br />

87,305 10.0 0 11,905 0 $14,220<br />

D3217 Replace existing GYM HID fixtures with new fluorescent fixtures highbays w/sensors<br />

113,896 13.0 0 0 0 $10,023<br />

D3218 Replace gym HID and strength & conditioning fixtures with new fluorescent fixtures highbays (sensors in gyms only)<br />

229,211 30.0 0 0 0 $20,171<br />

Basic Gross Area (sf): 113,383<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Athletics<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$22,142 $17,524 $4,618 0.7<br />

Committed Tier:<br />

Backup<br />

$16,705 $62,162 $3,341 0.1<br />

Committed Tier:<br />

Backup<br />

$95,861 $32,858 $63,003 4.4<br />

Committed Tier:<br />

Backup<br />

$38,731 $27,335 $11,396 1.1<br />

Committed Tier:<br />

Backup<br />

$83,199 $55,011 $28,188 1.4<br />

Totals 579,911 54.0 2,152 11,905 88,055 $74,966 $256,638 $194,890 $110,546 1.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,435,100 67,200 12.7 0.6<br />

188.9<br />

1,435,100 67,200 12.7 0.6<br />

188.9<br />

784,745 28,395 6.9 0.3<br />

95.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

49.2%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th