24.07.2013 Views

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$37,515 $27,666<br />

$3,095<br />

$4,873<br />

$45,483<br />

$4,548<br />

$12,617<br />

$4,206<br />

$5,047<br />

N/A<br />

$3,320<br />

$30,986<br />

$3,099<br />

Totals: $50,032 $34,085<br />

Total Project Cost: $105,987<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $105,987<br />

Rebate/Incentive*:<br />

$84,789<br />

Net Project Cost: $21,197<br />

Net Simple Payback Period (yrs): 0.6<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

389,410<br />

0<br />

$34,268<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!