<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1038 S-1, 5 & 6 CAV to VAV<br />

D1039 S2, 3 & 4Aircuity<br />

D3030 Monitoring Based Commissioning<br />

JULES STEIN<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4333<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

D3031 SBD, New/Renov - Jules Stein Eye Institute Seismic Repair<br />

LOS ANGELES<br />

1967<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

279,911 7.0 2,196 0 108,103 $43,540<br />

102,285 9.0 1,358 0 64,913 $20,571<br />

166,140 19.0 0 17,845 0 $24,419<br />

667,434 76.0 0 31,804 0 $76,198<br />

Basic Gross Area (sf): 87,905<br />

Building Type: COMPLEX<br />

Primary Asset Type: Hospitals<br />

Secondary Asset Type: Office<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$121,465 $115,384 $24,293 0.6<br />

Committed Tier:<br />

Backup<br />

$317,011 $53,987 $263,024 12.8<br />

Committed Tier:<br />

Backup<br />

$148,640 $57,719 $90,921 3.7<br />

Committed Tier:<br />

Backup<br />

$777,227 $191,988 $585,239 7.7<br />

Totals 1,215,770 111.0 3,554 49,649 173,016 $164,729 $1,364,343 $419,078 $963,477 5.8<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,225,300 104,100 25.3 1.2<br />

377.6<br />

2,225,300 104,100 25.3 1.2<br />

377.6<br />

871,117 10,026 9.9 0.1<br />

112.9<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

70.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th