<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1009 Vivarium - CV Rebalance<br />

D1010 SF - 4 & 5 - Aircuity<br />

D3025 Monitoring Based Commissioning<br />

LIFE SCIENCE<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4320<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1954<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

0 0.0 725 0 43,530 $6,739<br />

350,121 32.0 5,889 0 299,188 $82,105<br />

405,619 46.0 0 43,566 0 $59,617<br />

Basic Gross Area (sf): 214,613<br />

Building Type: COMPLEX<br />

Primary Asset Type: Office Support<br />

Secondary Asset Type: Laboratory<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$58,784 $17,420 $41,364 6.1<br />

Committed Tier:<br />

Backup<br />

$2,503,946 $215,086 $2,288,860 27.9<br />

Committed Tier:<br />

Backup<br />

$362,894 $140,915 $221,979 3.7<br />

Totals 755,740 78.0 6,614 43,566 342,718 $148,461 $2,925,624 $373,421 $2,552,203 17.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

5,432,900 254,200 25.3 1.2<br />

377.6<br />

5,432,900 254,200 25.3 1.2<br />

377.6<br />

4,402,986 127,959 20.5 0.6<br />

269.7<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.6%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th