<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1036 AHU - 3 VIV to VAV SP Reset<br />

D1037 VFD + DCV for a CAV system<br />

D3047 Monitoring Based Commissioning<br />

ENTREP HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C515C<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1995<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

79,357 1.0 600 0 33,987 $12,432<br />

51,550 2.0 117 0 3,161 $5,379<br />

55,895 6.0 0 7,622 0 $9,104<br />

Basic Gross Area (sf): 72,591<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$41,969 $33,071 $8,898 0.7<br />

Committed Tier:<br />

Backup<br />

$10,407 $14,441 $2,081 0.4<br />

Committed Tier:<br />

Backup<br />

$61,372 $21,037 $40,335 4.4<br />

Totals 186,802 9.0 717 7,622 37,148 $26,915 $113,748 $68,549 $51,314 1.9<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

918,800 43,000 12.7 0.6<br />

188.8<br />

918,800 43,000 12.7 0.6<br />

188.8<br />

702,280 26,416 9.7 0.4<br />

135.4<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

28.3%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th