PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: ACS - 1 to 5 - SP Reset<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: ENGR BLDG 4<br />

Building Key: 04C4256A<br />

Basic Gross Area (sf): 294,124<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1062<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

283,121<br />

3.0<br />

0<br />

155,143<br />

3,127<br />

Equipment Description Qty<br />

\9. Engineering IV\1. <strong>UC</strong>LA CVRH_VAV Engineering IV ACS 1 to 5 - SP Reset.xls<br />

Project Description Reference(s): Air Handler Project 4. Static Pressure Reset on Variable Air Volume Air Handlers .<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

407,235<br />

39,088<br />

$136,824<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

SAV with InCite 5 $4,500.00 $23,063 $7,150.00 $40,076<br />

License Fee (estimated per 1000 CFM) 267 $0.00 $0 $56.00 $16,761<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$23,063 $56,837<br />

$1,903<br />

$2,996<br />

$27,961<br />

$2,796<br />

$15,117<br />

$5,039<br />

$6,047<br />

N/A<br />

$6,820<br />

$63,657<br />

$6,366<br />

Totals: $30,757 $70,023<br />

Total Project Cost: $126,983<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $126,983<br />

Rebate/Incentive*:<br />

$101,586<br />

Net Project Cost: $25,397<br />

Net Simple Payback Period (yrs): 0.5<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

589,949<br />

0<br />

$51,915<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.