<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1022 AC 1 & 2 - SP Reset<br />

D1023 AC 3, 4, 6 to 8 - CAV to VAV<br />

D3039 Monitoring Based Commissioning<br />

ROYCE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4375<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1929<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

41,632 0.0 765 0 29,290 $9,720<br />

116,731 11.0 -46 0 584 $10,057<br />

142,198 16.0 0 19,391 0 $23,161<br />

Basic Gross Area (sf): 184,673<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Auditorium<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$45,550 $25,178 $20,372 2.1<br />

Committed Tier:<br />

Backup<br />

$185,171 $27,553 $157,618 15.7<br />

Committed Tier:<br />

Backup<br />

$156,134 $53,519 $102,615 4.4<br />

Totals 300,561 27.0 719 19,391 29,874 $42,938 $386,856 $106,250 $280,605 6.5<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,337,500 109,400 12.7 0.6<br />

188.8<br />

2,337,500 109,400 12.7 0.6<br />

188.8<br />

2,013,040 81,022 10.9 0.4<br />

155.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

17.7%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th