24.07.2013 Views

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

UC Los Angeles Campus & Medical Center Strategic Energy Plan ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1060 Apply DDC controls, convert to VAV<br />

D3043 Monitoring Based Commissioning<br />

D6013 TOD EF<br />

BUNCHE HALL<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4580<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1964<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

1,411,691 67.0 7,204 0 0 $163,787<br />

176,521 20.0 0 24,071 0 $28,752<br />

8,081 0.0 0 0 0 $711<br />

Basic Gross Area (sf): 229,248<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: Laboratory<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$3,634,425 $428,856 $3,205,569 19.6<br />

Committed Tier:<br />

Backup<br />

$193,820 $66,436 $127,384 4.4<br />

Committed Tier:<br />

Backup<br />

$2,253 $1,939 $451 0.6<br />

Totals 1,596,293 87.0 7,204 24,071 0 $193,250 $3,830,498 $497,231 $3,333,404 17.2<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

2,901,700 135,800 12.7 0.6<br />

188.8<br />

2,901,700 135,800 12.7 0.6<br />

188.8<br />

1,305,407 21,679 5.7 0.1<br />

67.8<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

64.1%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!