Table 11.1: SEP Projects by Funding Source and Project Type (Continued)<br />

Net<br />

Simple<br />

Payback<br />

(yrs)<br />

Net Project<br />

Cost ($)<br />

Gross<br />

Estimated<br />

Utility<br />

Incentive ($)<br />

Estimated<br />

Project Cost ($)<br />

Total Cost<br />

Savings ($/yr)<br />

Total<br />

Purchased<br />

Gas Savings<br />

(th/yr)<br />

Demand<br />

Savings (kW)<br />

$ 13,578 $ 111,476 $ 37,030 $ 74,446 5.5<br />

-<br />

18.0<br />

$ 2,303 $ 18,905 $ 6,280 $ 12,625 5.5<br />

-<br />

3.0<br />

$ 32,554 $ 267,281 $ 88,784 $ 178,497 5.5<br />

-<br />

42.0<br />

$ 3,414 $ 31,854 $ 9,312 $ 22,542 6.6<br />

-<br />

4.0<br />

$ 55,660 $ 456,985 $ 151,800 $ 305,185 5.5<br />

-<br />

72.0<br />

Total<br />

Purchased<br />

SEP<br />

Electricity<br />

Project Building<br />

Savings<br />

ID Key Building Name Project Name<br />

(kWh/yr)<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3199 04C4263 PARKG STR 32<br />

and install photocell control where appropriate 154,290<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3197 04C4301 PARKG STR RC<br />

and install photocell control where appropriate 26,166<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3206 04C4322 PARKG STR 7<br />

and install photocell control where appropriate 369,935<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3209 04C4332H PARKG STR E<br />

and install photocell control where appropriate 38,798<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3200 04C4342 PARKG STR 1<br />

and install photocell control where appropriate 632,498<br />

Replace gym HID and strength & conditioning fixtures with new<br />

D3218 04C4360 SAC<br />

fluorescent fixtures highbays (sensors in gyms only) 229,211<br />

Replace existing GYM HID fixtures with new fluorescent fixtures<br />

D3217 04C4360 SAC<br />

highbays w/sensors 113,896<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3196 04C4490 PARKG STR DD<br />

and install photocell control where appropriate 44,212<br />

Retrofit existing 175-watt suspended metal halide fixtures with<br />

ceramic metal halide and replace quartz floods with fluorescent<br />

D3193 04C4582 ACKERMAN<br />

T5HO wall washes 222,825<br />

Replace high pressure sodium fixtures with induction fixtures<br />

D3204 04C4587 PARKG STR 5<br />

and install photocell control where appropriate 115,041<br />

Subtotal, Other Fund Source Lighting 4,048,282<br />

Subtotal, Other Fund Source Projects 6,577,145<br />

<strong>UC</strong> <strong>Los</strong> <strong>Angeles</strong> Total 108,938,355<br />

$ 20,171 $ 83,199 $ 55,011 $ 28,188 1.4<br />

-<br />

30.0<br />

$ 10,023 $ 38,731 $ 27,335 $ 11,396 1.1<br />

-<br />

13.0<br />

$ 3,891 $ 31,943 $ 10,611 $ 21,332 5.5<br />

-<br />

5.0<br />

$ 19,609 $ 174,962 $ 53,478 $ 121,484 6.2<br />

-<br />

42.0<br />

$ 10,124 $ 83,444 $ 27,610 $ 55,834 5.5<br />

$ 356,249 $ 2,817,067 $ 971,590 $ 1,845,477 5.2<br />

$ 578,789 $ 6,279,572 $ 1,539,223 $ 4,740,349 8.2<br />

$ 9,773,705 $ 102,849,562 $ 24,895,987 $ 77,953,575 8.0<br />

-<br />

-<br />

-<br />

279,298<br />

13.0<br />

481.0<br />

829.0<br />

10,817.0