<strong>Strategic</strong> <strong>Energy</strong> <strong>Plan</strong> Projects<br />

SEP ID<br />

Number Project Name<br />

D1035 AHU 1 to 8 T-1 & T-2 CAV to VAV<br />

D3040 Monitoring Based Commissioning<br />

D6003 Replace Boiler<br />

D6005 Replace Chiller<br />

D6011 CT VFDs<br />

UNEX<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location:<br />

Building Key: 04C4415<br />

Funding Source: STATE<br />

Year Built:<br />

Electric<br />

(kWh/yr)<br />

Peak<br />

Demand<br />

(kW)<br />

LOS ANGELES<br />

1971<br />

Building Savings Cost<br />

HW/Steam<br />

(MMBTU/yr)<br />

Gas<br />

(th/yr)<br />

Chilled<br />

Water<br />

(ton-hr/yr)<br />

Purchased<br />

Utility Cost<br />

Savings<br />

($/yr)<br />

412,262 21.0 0 34,433 0 $55,187<br />

73,200 8.0 0 9,982 0 $11,923<br />

0 0.0 0 5,938 0 $3,261<br />

212,201 72.0 0 0 0 $18,674<br />

11,650 2.0 0 0 0 $1,025<br />

Basic Gross Area (sf): 95,065<br />

Building Type: BASIC<br />

Primary Asset Type: Office<br />

Secondary Asset Type: College Lecture Cl<br />

Project<br />

Cost<br />

($)<br />

Gross<br />

Potential<br />

Incentive<br />

($)<br />

Net<br />

Cost ($)<br />

Committed Tier:<br />

Simple<br />

Payback<br />

(yr)<br />

Backup<br />

$3,048,573 $133,376 $2,915,197 52.8<br />

Committed Tier:<br />

Backup<br />

$80,373 $27,550 $52,823 4.4<br />

Committed Tier:<br />

Backup<br />

$156,646 $5,938 $150,708 46.2<br />

Committed Tier:<br />

Backup<br />

$352,860 $50,928 $301,932 16.2<br />

Committed Tier:<br />

Backup<br />

$7,599 $2,796 $4,803 4.7<br />

Totals 709,313 103.0 0 50,353 0 $90,069 $3,646,051 $220,588 $3,425,463 38.0<br />

Building<br />

Benchmarking<br />

Baseline<br />

Implement Partnership Projects<br />

Implement SEP Projects<br />

Equivalent<br />

Electricity<br />

(kWh/yr)<br />

Equivalent<br />

Natural Gas<br />

(th/yr)<br />

Equivalent Electric<br />

<strong>Energy</strong> Use Index<br />

(kWh/sf-yr)<br />

Equivalent Natural<br />

Gas <strong>Energy</strong> Use<br />

Index (th/sf-yr)<br />

Source <strong>Energy</strong><br />

Use Index<br />

(kBTU/sf-yr)<br />

1,203,300 56,300 12.7 0.6<br />

188.8<br />

1,203,300 56,300 12.7 0.6<br />

188.8<br />

493,987 5,947 5.2 0.1<br />

59.5<br />

Assumed Incentives: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh<br />

th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm<br />

kWh/ton-hr: 0.8<br />

Cap 80% project cost<br />

th/ton-hr: 0.0<br />

Percent<br />

Savings<br />

(%)<br />

N/A<br />

0.0%<br />

68.5%<br />

Source <strong>Energy</strong> Use Conversion Factors:<br />

10.239 kBTU per kWh 100 kBTU per th