PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: AHU 1 to 8 T-1 & T-2 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: UNEX<br />

Building Key: 04C4415<br />

Basic Gross Area (sf): 95,065<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1035<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

412,262<br />

21.0<br />

34,433<br />

Equipment Description Qty<br />

\29. Unex\1. <strong>UC</strong>LA MZ_DD_VAV Unex AHU 1 to 8 T-1 & T-2 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 1. Convert Constant Volume Air Handlers and Terminal Boxes to Variable Air Volume & Air<br />

Handler Project 6. Convert Air Handlers to Direct Digital Control.<br />

0<br />

0<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

Extended Bare<br />

Labor Cost ($)<br />

412,262<br />

34,433<br />

$133,376<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

20 hp VFD 7 $3,375.00 $24,216 $820.00 $6,435<br />

7.5 hp VFD 2 $1,975.00 $4,049 $545.00 $1,222<br />

DD CAV to VAV (207 points) 9 $12,117.07 $111,780 $7,386.26 $74,520<br />

Zone Level Controller & DDC - dual duct 212 $4,097.56 $890,400 $2,497.77 $593,600<br />

DART Control 8 $8,710.00 $71,422 $2,900.00 $26,007<br />

Dart @ Zone 106 $440.00 $47,806 $128.00 $15,210<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$1,151,389 $717,503<br />

$94,990<br />

$149,565<br />

$1,395,944<br />

$139,594<br />

$362,925<br />

$120,975<br />

$145,170<br />

N/A<br />

$86,100<br />

$803,604<br />

$80,360<br />

Totals: $1,535,538 $883,964<br />

Total Project Cost: $3,048,573<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $3,048,573<br />

Rebate/Incentive*:<br />

$133,376<br />

Net Project Cost: $2,915,197<br />

Net Simple Payback Period (yrs): 52.8<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

627,124<br />

0<br />

$55,187<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!