PROJECT DETAIL REPORT<br />

SEP Project ID Number:<br />

Project: S-4 CAV to VAV<br />

<strong>Campus</strong>: LOS ANGELES<br />

Location: LOS ANGELES<br />

Building: LAW<br />

Building Key: 04C4317<br />

Basic Gross Area (sf): 275,439<br />

Calculation File:<br />

Project <strong>Energy</strong> Savings Summary<br />

Electric (kWh/yr):<br />

Peak Demand (kW):<br />

Gas (th/yr):<br />

Chilled Water (ton-hr/yr):<br />

HW/Steam (MMBTu/yr):<br />

Project Cost Summary<br />

D1045<br />

Building <strong>Energy</strong> Savings Incentive Calculation Basis<br />

16,081<br />

1.0<br />

0<br />

38,223<br />

449<br />

Equipment Description Qty<br />

\33. LAW\3. <strong>UC</strong>LA CVRH_VAV LAW S 4 CAV to VAV.xls<br />

Project Description Reference(s): Air Handler Project 2. Convert Constant Volume Air Handlers to Variable Air Volume.<br />

Assumed Incentive Rates: Central <strong>Plan</strong>t Efficiencies:<br />

Electricity $0.24 per annual kWh th/MMBTU: 12.5<br />

Natural Gas $1 per annual therm kWh/ton-hr: 0.8<br />

th/ton-hr: 0.0<br />

Equivalent Electric Savings (kWh/yr):<br />

Equivalent Gas Savings (th/yr):<br />

Anticipated Gross Incentive:<br />

Bare Material Extended Bare<br />

Cost per Unit ($) Material Cost ($)<br />

<strong>Campus</strong> Prioritization and Schedule<br />

Project Tier:<br />

Start Preliminary Engineering:<br />

Scheduled Completion:<br />

Bare Labor Cost<br />

per Unit ($)<br />

46,659<br />

5,613<br />

Extended Bare<br />

Labor Cost ($)<br />

$16,811<br />

Backup<br />

Note: Where the anticipated gross incentive exceeds 80% of the total project<br />

cost, the incentive is capped. The net incentive amount is shown below in the<br />

Project Cost Summary.<br />

3 hp VFD 1 $1,525.00 $1,563 $455.00<br />

$510<br />

5 hp VFD 1 $1,675.00 $1,717 $455.00<br />

$510<br />

Dart Controls 1 $8,710.00 $8,928 $2,900.00 $3,251<br />

Dart @ zones 3 $440.00 $1,353 $128.00<br />

$430<br />

City: <strong>Los</strong> <strong>Angeles</strong><br />

City Index Material Multiplier:<br />

City Index Labor Multiplier:<br />

102.5%<br />

112.1%<br />

Raw Costs:<br />

Sales Tax: 8.25%<br />

Contractor O&P: 12.00%<br />

Subtotals:<br />

Contingency:<br />

Engineering:<br />

Construction Phase:<br />

Project Management:<br />

10.00%<br />

15.00%<br />

5.00%<br />

6.00%<br />

$13,561 $4,701<br />

$1,119<br />

$1,762<br />

$16,441<br />

$1,644<br />

$3,582<br />

$1,194<br />

$1,433<br />

N/A<br />

$564<br />

$5,266<br />

$527<br />

Totals: $18,085 $5,792<br />

Total Project Cost: $30,085<br />

Project Economic Summary, Including Cogeneration and Purchased Utility Impacts<br />

Total Project Cost: $30,085<br />

Rebate/Incentive*:<br />

$16,811<br />

Net Project Cost: $13,274<br />

Net Simple Payback Period (yrs): 2.1<br />

Total Purchased Electricity Savings (kWh/yr):<br />

Total Purchased Gas Savings (th/yr):<br />

Total Purchased Annual Cost Savings ($/yr):<br />

*Highlighted incentives have been capped at 80% of the total project cost. It is recommended that these projects be bundled together with other projects to maximize<br />

incentive funding.<br />

71,619<br />

0<br />